Sunview Dr

candidate project Design 6693a3db-5a59-47b1-bd02-41f448cf9957

A gas infrastructure project led by PG&E, this active effort will replace or upgrade gas lines along Agua Way, Glenview Drive, and Sunview Drive in San Francisco's Miraloma Park area. The project is currently in the design phase, with construction scheduled to run from August 2026 to April 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner PG&E - Gas (Capital Planning) reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: PG&E - Gas (Capital Planning)”
contact.email s2d4@pge.com reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: s2d4@pge.com”
contact.name Stephen Dupree reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Stephen Dupree”
location.geometry 3 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“3 published segment geometries”
location.street_limits AGUA WAY from CHAVES AVE to TERESITA BLVD; GLENVIEW DR from DAWNVIEW WAY to BURNETT AVE; SUNVIEW DR from PORTOLA DR to START: 1-99 BLOCK derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Sunview Dr reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Sunview Dr”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Gas reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Gas”
schedule.end 2027-04-08 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-04-08T00:00:00.000”
schedule.start 2026-08-10 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-08-10T00:00:00.000”
source.project_id 8960 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8960”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary A gas infrastructure project led by PG&E, this active effort will replace or upgrade gas lines along Agua Way,... generated llm:summarize · retrieved 2026-07-17
“generated from 12 resolved fields; input sha256-v2=b789399f09d5274488b9cdf66ea0c56e8377c2b4f6c68ae59ce5cbf29379fccb”

Source records

Public Works coordinated projects (DotMaps) key 8960 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary A gas infrastructure project led by PG&E, this active effort will replace or upgrade gas lines along Agua Way, Glenview Drive, and Sunview Drive in San Francisco's Miraloma Park area. The project is currently in the design phase, with construction scheduled to run from August 2026 to April 2027. No cost figures have been published. generated 2026-07-17 live
location.geometry 3 geometries reported 2026-07-17 live
location.street_limits AGUA WAY from CHAVES AVE to TERESITA BLVD; GLENVIEW DR from DAWNVIEW WAY to BURNETT AVE; SUNVIEW DR from PORTOLA DR to START: 1-99 BLOCK derived 2026-07-17 live
schedule.end 2027-04-08 reported 2026-07-17 live
schedule.start 2026-08-10 reported 2026-07-17 live
source.project_id 8960 reported 2026-07-17 live
contact.email s2d4@pge.com reported 2026-07-17 live
contact.name Stephen Dupree reported 2026-07-17 live
agency.owner PG&E - Gas (Capital Planning) reported 2026-07-17 live
project_type Gas reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
name Sunview Dr reported 2026-07-17 live