Brotherhood & Alemany Safety Improvements Project (BASIP)
The Brotherhood & Alemany Safety Improvements Project (BASIP) is a traffic-safety and streetscape project led by the SFMTA's Livable Streets division that will reconfigure the intersection of Brotherhood Way at Alemany Boulevard in San Francisco to improve multi-modal safety and support a potential adjacent public library. The work will design and build one or more signalized pedestrian crossings of Alemany Boulevard, with possible ancillary improvements such as sidewalk reconstruction, bulbouts, curb ramps, new traffic signals, reconfigured travel lanes and median islands, and landscaping. The project is currently in the planning phase, having started in early 2023, and is scheduled to run through the end of 2027. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF MTA SS - Livable Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Livable Streets” |
| contact.email | Casey.Hildreth@sfmta.com |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Casey.Hildreth@sfmta.com” |
| contact.name | Casey Hildreth |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Casey Hildreth” |
| description | The project will reconfigure the intersection of Brotherhood Way at Alemany Boulevard to improve multi-modal safety and support the potential adjacent development of a public library. The project will design and construct one or more signalized pedestrian crossings of Alemany Boulevard at the Brotherhood Way and Sagamore/Orizaba intersections. Ancillary work may include sidewalk reconstruction, bulbouts and curb ramps; new traffic signal cabinets, conduit and poles; reconfiguration of travel lanes and median islands; and landscaping. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: The project will reconfigure the intersection of Brotherhood Way at Alemany Boulevard to improve multi-modal safety and support the potential...” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| location.street_limits | BROTHERHOOD WAY |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Brotherhood & Alemany Safety Improvements Project (BASIP) |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Brotherhood & Alemany Safety Improvements Project (BASIP)” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Traffic signal(s), roadway and streetscape |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Traffic signal(s), roadway and streetscape” |
| schedule.end | 2027-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-31T00:00:00.000” |
| schedule.start | 2023-02-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2023-02-01T00:00:00.000” |
| source.project_id | 13198 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 13198” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Brotherhood & Alemany Safety Improvements Project (BASIP) is a traffic-safety and streetscape project led by the... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=e0ac057e6248b019d502747b3c66d924e5a90a5d1975e71df69f772e09e271af” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 13198 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | The Brotherhood & Alemany Safety Improvements Project (BASIP) is a traffic-safety and streetscape project led by the SFMTA's Livable Streets division that will reconfigure the intersection of Brotherhood Way at Alemany Boulevard in San Francisco to improve multi-modal safety and support a potential adjacent public library. The work will design and build one or more signalized pedestrian crossings of Alemany Boulevard, with possible ancillary improvements such as sidewalk reconstruction, bulbouts, curb ramps, new traffic signals, reconfigured travel lanes and median islands, and landscaping. The project is currently in the planning phase, having started in early 2023, and is scheduled to run through the end of 2027. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | BROTHERHOOD WAY | derived | 2026-07-17 | live |
| schedule.end | 2027-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2023-02-01 | reported | 2026-07-17 | live |
| source.project_id | 13198 | reported | 2026-07-17 | live |
| contact.email | Casey.Hildreth@sfmta.com | reported | 2026-07-17 | live |
| contact.name | Casey Hildreth | reported | 2026-07-17 | live |
| agency.owner | SF MTA SS - Livable Streets | reported | 2026-07-17 | live |
| project_type | Traffic signal(s), roadway and streetscape | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | The project will reconfigure the intersection of Brotherhood Way at Alemany Boulevard to improve multi-modal safety and support the potential adjacent development of a public library. The project will design and construct one or more signalized pedestrian crossings of Alemany Boulevard at the Brotherhood Way and Sagamore/Orizaba intersections. Ancillary work may include sidewalk reconstruction, bulbouts and curb ramps; new traffic signal cabinets, conduit and poles; reconfiguration of travel lanes and median islands; and landscaping. | reported | 2026-07-17 | live |
| name | Brotherhood & Alemany Safety Improvements Project (BASIP) | reported | 2026-07-17 | live |