The Brotherhood & Alemany Safety Improvements Project (BASIP) is a traffic-safety and streetscape project led by the SFMTA's Livable Streets division that will reconfigure the intersection of Brotherhood Way at Alemany Boulevard in San Francisco to improve multi-modal safety and support a potential adjacent public library. The work will design and build one or more signalized pedestrian crossings of Alemany Boulevard, with possible ancillary improvements such as sidewalk reconstruction, bulbouts, curb ramps, new traffic signals, reconfigured travel lanes and median islands, and landscaping. The project is currently in the planning phase, having started in early 2023, and is scheduled to run through the end of 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF MTA SS - Livable Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Livable Streets”
contact.email Casey.Hildreth@sfmta.com reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Casey.Hildreth@sfmta.com”
contact.name Casey Hildreth reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Casey Hildreth”
description The project will reconfigure the intersection of Brotherhood Way at Alemany Boulevard to improve multi-modal safety and support the potential adjacent development of a public library. The project will design and construct one or more signalized pedestrian crossings of Alemany Boulevard at the Brotherhood Way and Sagamore/Orizaba intersections. Ancillary work may include sidewalk reconstruction, bulbouts and curb ramps; new traffic signal cabinets, conduit and poles; reconfiguration of travel lanes and median islands; and landscaping. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: The project will reconfigure the intersection of Brotherhood Way at Alemany Boulevard to improve multi-modal safety and support the potential...”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits BROTHERHOOD WAY derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Brotherhood & Alemany Safety Improvements Project (BASIP) reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Brotherhood & Alemany Safety Improvements Project (BASIP)”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Traffic signal(s), roadway and streetscape reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Traffic signal(s), roadway and streetscape”
schedule.end 2027-12-31 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-31T00:00:00.000”
schedule.start 2023-02-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2023-02-01T00:00:00.000”
source.project_id 13198 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 13198”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Brotherhood & Alemany Safety Improvements Project (BASIP) is a traffic-safety and streetscape project led by the... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=e0ac057e6248b019d502747b3c66d924e5a90a5d1975e71df69f772e09e271af”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4638926802139, 37.71163278216945]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.46389268, 37.71163278]}]}

Source records

Public Works coordinated projects (DotMaps) key 13198 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The Brotherhood & Alemany Safety Improvements Project (BASIP) is a traffic-safety and streetscape project led by the SFMTA's Livable Streets division that will reconfigure the intersection of Brotherhood Way at Alemany Boulevard in San Francisco to improve multi-modal safety and support a potential adjacent public library. The work will design and build one or more signalized pedestrian crossings of Alemany Boulevard, with possible ancillary improvements such as sidewalk reconstruction, bulbouts, curb ramps, new traffic signals, reconfigured travel lanes and median islands, and landscaping. The project is currently in the planning phase, having started in early 2023, and is scheduled to run through the end of 2027. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits BROTHERHOOD WAY derived 2026-07-17 live
schedule.end 2027-12-31 reported 2026-07-17 live
schedule.start 2023-02-01 reported 2026-07-17 live
source.project_id 13198 reported 2026-07-17 live
contact.email Casey.Hildreth@sfmta.com reported 2026-07-17 live
contact.name Casey Hildreth reported 2026-07-17 live
agency.owner SF MTA SS - Livable Streets reported 2026-07-17 live
project_type Traffic signal(s), roadway and streetscape reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Active reported 2026-07-17 live
description The project will reconfigure the intersection of Brotherhood Way at Alemany Boulevard to improve multi-modal safety and support the potential adjacent development of a public library. The project will design and construct one or more signalized pedestrian crossings of Alemany Boulevard at the Brotherhood Way and Sagamore/Orizaba intersections. Ancillary work may include sidewalk reconstruction, bulbouts and curb ramps; new traffic signal cabinets, conduit and poles; reconfiguration of travel lanes and median islands; and landscaping. reported 2026-07-17 live
name Brotherhood & Alemany Safety Improvements Project (BASIP) reported 2026-07-17 live