sfproj. every fact links to its evidence

← all projects

PW Various Locations Curb Ramp No 19

candidate project Design 641eab36-a77c-45fc-8d1f-59cc7130c0a4

This is a curb ramp construction project led by San Francisco Public Works to build and upgrade curb ramps at various locations across Districts 4, 5, 7, and 9 to meet ADA accessibility standards. The work spans sites in the city including areas around Carolina Street and the Great Highway. The project is currently in the design phase, with construction scheduled to run from January 2027 to June 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Anastastia.Haddad@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org”
contact.name Anastastia Haddad reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad”
description Design and construct curb ramps at various locations in Districts 4, 5, 7, and 9 to meet ADA standards. V: Folder 2473I reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Design and construct curb ramps at various locations in Districts 4, 5, 7, and 9 to meet ADA standards. V: Folder 2473I”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-30
“1 published segment geometries”
location.street_limits Great Hwy derived socrata:btxj-k9uh · retrieved 2026-08-30
“assembled from segment on/from/to street fields”
name PW Various Locations Curb Ramp No 19 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW Various Locations Curb Ramp No 19”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2027-06-29 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-06-29T00:00:00.000”
schedule.start 2027-01-31 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-01-31T00:00:00.000”
source.project_id 53391 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 53391”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary This is a curb ramp construction project led by San Francisco Public Works to build and upgrade curb ramps at... generated llm:summarize · retrieved 2026-08-11
“generated from 13 resolved fields; input sha256-v2=544d766454178d020195b56accbd91b83c480e4e5ca780f477a6025375e2b5b9”

Changes

2026-08-30 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.39952372, 37.7538631]}, {'type': 'Point', 'coordinates': [-122.50938162, 37.76027169]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.50938162, 37.76027169]}]}
2026-08-30 field changed immaterial Carolina St; Great HwyGreat Hwy
2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.3995237183117, 37.75386309638704]}, {'type': 'Point', 'coordinates': [-122.50938162101379, 37.76027168636124]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.39952372, 37.7538631]}, {'type': 'Point', 'coordinates': [-122.50938162, 37.76027169]}]}
2026-08-11 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.3995237183117, 37.75386309638704]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.3995237183117, 37.75386309638704]}, {'type': 'Point', 'coordinates': [-122.50938162101379, 37.76027168636124]}]}
2026-08-11 field changed immaterial Carolina StCarolina St; Great Hwy

Source records

Public Works coordinated projects (DotMaps) key 53391 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-30 live
location.street_limits Great Hwy derived 2026-08-30 live
location.geometry 2 geometries reported 2026-08-27 superseded
summary This is a curb ramp construction project led by San Francisco Public Works to build and upgrade curb ramps at various locations across Districts 4, 5, 7, and 9 to meet ADA accessibility standards. The work spans sites in the city including areas around Carolina Street and the Great Highway. The project is currently in the design phase, with construction scheduled to run from January 2027 to June 2027. No cost figures have been published. generated 2026-08-11 live
location.geometry 2 geometries reported 2026-08-11 superseded
location.street_limits Carolina St; Great Hwy derived 2026-08-11 superseded
summary The PW Various Locations Curb Ramp No 19 is a roadway project by San Francisco Public Works to design and construct ADA-compliant curb ramps at various locations across Districts 4, 5, 7, and 9. The project is currently active and in its design phase, with construction scheduled to run from January to June 2027. No cost figures have been published. generated 2026-07-18 superseded
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits Carolina St derived 2026-07-17 superseded
schedule.end 2027-06-29 reported 2026-07-17 live
schedule.start 2027-01-31 reported 2026-07-17 live
source.project_id 53391 reported 2026-07-17 live
contact.email Anastastia.Haddad@sfdpw.org reported 2026-07-17 live
contact.name Anastastia Haddad reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Design and construct curb ramps at various locations in Districts 4, 5, 7, and 9 to meet ADA standards. V: Folder 2473I reported 2026-07-17 live
name PW Various Locations Curb Ramp No 19 reported 2026-07-17 live