sfproj. every fact links to its evidence

← all projects

MF 22 Fillmore Transit Priority Project

candidate project Design 63d7b2b2-b272-43e4-86c2-c9dfa24f8d65

The MF 22 Fillmore Transit Priority Project is an active roadway project led by San Francisco Public Works (Streets & Highways division) to design bulb-outs and curb ramps along Route 22 Fillmore, in the area of 16th Street. The project is currently in the design phase. No cost figures or schedule dates have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Ellen.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Ellen.Wong@sfdpw.org”
contact.name Ellen Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Ellen Wong”
description Bulb out and curb ramps design service for Route 22 Fillmore reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Bulb out and curb ramps design service for Route 22 Fillmore”
location.geometry 2 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“2 published segment geometries”
location.street_limits 16th St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name MF 22 Fillmore Transit Priority Project reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: MF 22 Fillmore Transit Priority Project”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
source.project_id 63549 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63549”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The MF 22 Fillmore Transit Priority Project is an active roadway project led by San Francisco Public Works (Streets... generated llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=9ed5fabc02070355b69880249a8648ba67b397e75b2f0f0c1d083278631aea4d”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4075342293836, 37.765783299318464]}, {'type': 'Point', 'coordinates': [-122.42638170827915, 37.76464568785981]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40753423, 37.7657833]}, {'type': 'Point', 'coordinates': [-122.42638171, 37.76464569]}]}

Source records

Public Works coordinated projects (DotMaps) key 63549 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 2 geometries reported 2026-08-27 live
summary The MF 22 Fillmore Transit Priority Project is an active roadway project led by San Francisco Public Works (Streets & Highways division) to design bulb-outs and curb ramps along Route 22 Fillmore, in the area of 16th Street. The project is currently in the design phase. No cost figures or schedule dates have been published. generated 2026-07-18 live
location.geometry 2 geometries reported 2026-07-17 superseded
location.street_limits 16th St derived 2026-07-17 live
source.project_id 63549 reported 2026-07-17 live
contact.email Ellen.Wong@sfdpw.org reported 2026-07-17 live
contact.name Ellen Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Bulb out and curb ramps design service for Route 22 Fillmore reported 2026-07-17 live
name MF 22 Fillmore Transit Priority Project reported 2026-07-17 live