SEO Islais Creek Crossing Bypass Pipeline Service Life Extension Project - Flow Meter Scope
candidate project
Design
61cb717c-2304-4ae2-ae92-2d9c6ed94dc7
This is a sewer project led by the San Francisco Public Utilities Commission's Engineering Management Bureau, located along Quint Street. The work involves installing a flow meter with a vault and associated electrical and communication lines as part of extending the service life of the Islais Creek Crossing Bypass Pipeline. The project is currently in the design phase, with construction scheduled to run from May 2027 to December 2027. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC - Engineering Management Bureau |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC - Engineering Management Bureau” |
| description | Installing Flow Meter and vault and electrical/communication line |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Installing Flow Meter and vault and electrical/communication line” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| location.street_limits | QUINT ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | SEO Islais Creek Crossing Bypass Pipeline Service Life Extension Project - Flow Meter Scope |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: SEO Islais Creek Crossing Bypass Pipeline Service Life Extension Project - Flow Meter Scope” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sewer” |
| schedule.end | 2027-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-31T00:00:00.000” |
| schedule.start | 2027-05-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-05-01T00:00:00.000” |
| source.project_id | 47658 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 47658” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | This is a sewer project led by the San Francisco Public Utilities Commission's Engineering Management Bureau,... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=675fd4edd6c243814481f6986d2c785e568482505d9abe663774509ff36df64e” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 47658 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | This is a sewer project led by the San Francisco Public Utilities Commission's Engineering Management Bureau, located along Quint Street. The work involves installing a flow meter with a vault and associated electrical and communication lines as part of extending the service life of the Islais Creek Crossing Bypass Pipeline. The project is currently in the design phase, with construction scheduled to run from May 2027 to December 2027. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | QUINT ST | derived | 2026-07-17 | live |
| schedule.end | 2027-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2027-05-01 | reported | 2026-07-17 | live |
| source.project_id | 47658 | reported | 2026-07-17 | live |
| agency.owner | SF PUC - Engineering Management Bureau | reported | 2026-07-17 | live |
| project_type | Sewer | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Installing Flow Meter and vault and electrical/communication line | reported | 2026-07-17 | live |
| name | SEO Islais Creek Crossing Bypass Pipeline Service Life Extension Project - Flow Meter Scope | reported | 2026-07-17 | live |