SEO Islais Creek Crossing Bypass Pipeline Service Life Extension Project - Flow Meter Scope

candidate project Design 61cb717c-2304-4ae2-ae92-2d9c6ed94dc7

This is a sewer project led by the San Francisco Public Utilities Commission's Engineering Management Bureau, located along Quint Street. The work involves installing a flow meter with a vault and associated electrical and communication lines as part of extending the service life of the Islais Creek Crossing Bypass Pipeline. The project is currently in the design phase, with construction scheduled to run from May 2027 to December 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC - Engineering Management Bureau reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC - Engineering Management Bureau”
description Installing Flow Meter and vault and electrical/communication line reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Installing Flow Meter and vault and electrical/communication line”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits QUINT ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name SEO Islais Creek Crossing Bypass Pipeline Service Life Extension Project - Flow Meter Scope reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: SEO Islais Creek Crossing Bypass Pipeline Service Life Extension Project - Flow Meter Scope”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sewer”
schedule.end 2027-12-31 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-31T00:00:00.000”
schedule.start 2027-05-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-05-01T00:00:00.000”
source.project_id 47658 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 47658”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary This is a sewer project led by the San Francisco Public Utilities Commission's Engineering Management Bureau,... generated llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=675fd4edd6c243814481f6986d2c785e568482505d9abe663774509ff36df64e”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.3903411481537, 37.74405087343161], [-122.38977337488355, 37.74467761898949], [-122.38920650611175, 37.74530335305005], [-122.38812903245814, 37.74649267444347]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.39034115, 37.74405087], [-122.38977337, 37.74467762], [-122.38920651, 37.74530335], [-122.38812903, 37.74649267]]}]}

Source records

Public Works coordinated projects (DotMaps) key 47658 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary This is a sewer project led by the San Francisco Public Utilities Commission's Engineering Management Bureau, located along Quint Street. The work involves installing a flow meter with a vault and associated electrical and communication lines as part of extending the service life of the Islais Creek Crossing Bypass Pipeline. The project is currently in the design phase, with construction scheduled to run from May 2027 to December 2027. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits QUINT ST derived 2026-07-17 live
schedule.end 2027-12-31 reported 2026-07-17 live
schedule.start 2027-05-01 reported 2026-07-17 live
source.project_id 47658 reported 2026-07-17 live
agency.owner SF PUC - Engineering Management Bureau reported 2026-07-17 live
project_type Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Installing Flow Meter and vault and electrical/communication line reported 2026-07-17 live
name SEO Islais Creek Crossing Bypass Pipeline Service Life Extension Project - Flow Meter Scope reported 2026-07-17 live