Sunnydale Pump Station Safety Improvements

candidate project Construction 600f8c2e-9b86-465d-a3f5-aa76fa9c2fb6

The Sunnydale Pump Station Safety Improvements is an active water infrastructure project in San Francisco along Harney Way, owned by SF Public Works' IDC Mechanical division. The work addresses safety risks from groundwater and seawater intrusion by repairing structural deficiencies, fixing water leaks, and replacing corroded HVAC equipment, and it upgrades site security with new lighting, card readers, door contacts, interior sensing, and an intrusion detection system. The project is in the construction phase, which began in January 2025 and is scheduled to run through January 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Mechanical reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Mechanical”
contact.email raymond.xu@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: raymond.xu@sfdpw.org”
contact.name Wei Xu reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Wei Xu”
description 1) Address safety risks from groundwater and seawater intrusion: repair all structural deficiencies, address water leakage in manifold room and MCC, repair leaking door, perform electrical repairs, replace corroded HVAC equipment, perform desktop hydraulic analysis 2) Address security concerns: install new security signage and upgrade lighting to dusk-activated LED lighting, upgrade card readers and door contacts at all perimeter doors, add interior presence sensing, connected to an intrusion de reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 1) Address safety risks from groundwater and seawater intrusion: repair all structural deficiencies, address water leakage in manifold room and...”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits Harney Way derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Sunnydale Pump Station Safety Improvements reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Sunnydale Pump Station Safety Improvements”
phase Construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2028-01-14 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-01-14T00:00:00.000”
schedule.start 2025-01-15 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-01-15T00:00:00.000”
source.project_id 9769 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9769”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Sunnydale Pump Station Safety Improvements is an active water infrastructure project in San Francisco along... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=8da22166af94fdd25f0775f345ff73b410f5ed931e7df4c96100609115149c84”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.39342799493329, 37.708401674422646]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.39342799, 37.70840167]}]}

Source records

Public Works coordinated projects (DotMaps) key 9769 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The Sunnydale Pump Station Safety Improvements is an active water infrastructure project in San Francisco along Harney Way, owned by SF Public Works' IDC Mechanical division. The work addresses safety risks from groundwater and seawater intrusion by repairing structural deficiencies, fixing water leaks, and replacing corroded HVAC equipment, and it upgrades site security with new lighting, card readers, door contacts, interior sensing, and an intrusion detection system. The project is in the construction phase, which began in January 2025 and is scheduled to run through January 2028. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits Harney Way derived 2026-07-17 live
schedule.end 2028-01-14 reported 2026-07-17 live
schedule.start 2025-01-15 reported 2026-07-17 live
source.project_id 9769 reported 2026-07-17 live
contact.email raymond.xu@sfdpw.org reported 2026-07-17 live
contact.name Wei Xu reported 2026-07-17 live
agency.owner SF DPW IDC - Mechanical reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Construction reported 2026-07-17 live
status Active reported 2026-07-17 live
description 1) Address safety risks from groundwater and seawater intrusion: repair all structural deficiencies, address water leakage in manifold room and MCC, repair leaking door, perform electrical repairs, replace corroded HVAC equipment, perform desktop hydraulic analysis 2) Address security concerns: install new security signage and upgrade lighting to dusk-activated LED lighting, upgrade card readers and door contacts at all perimeter doors, add interior presence sensing, connected to an intrusion de reported 2026-07-17 live
name Sunnydale Pump Station Safety Improvements reported 2026-07-17 live