Sunnydale Pump Station Safety Improvements
candidate project
Construction
600f8c2e-9b86-465d-a3f5-aa76fa9c2fb6
The Sunnydale Pump Station Safety Improvements is an active water infrastructure project in San Francisco along Harney Way, owned by SF Public Works' IDC Mechanical division. The work addresses safety risks from groundwater and seawater intrusion by repairing structural deficiencies, fixing water leaks, and replacing corroded HVAC equipment, and it upgrades site security with new lighting, card readers, door contacts, interior sensing, and an intrusion detection system. The project is in the construction phase, which began in January 2025 and is scheduled to run through January 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Mechanical |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Mechanical” |
| contact.email | raymond.xu@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: raymond.xu@sfdpw.org” |
| contact.name | Wei Xu |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Wei Xu” |
| description | 1) Address safety risks from groundwater and seawater intrusion: repair all structural deficiencies, address water leakage in manifold room and MCC, repair leaking door, perform electrical repairs, replace corroded HVAC equipment, perform desktop hydraulic analysis 2) Address security concerns: install new security signage and upgrade lighting to dusk-activated LED lighting, upgrade card readers and door contacts at all perimeter doors, add interior presence sensing, connected to an intrusion de |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 1) Address safety risks from groundwater and seawater intrusion: repair all structural deficiencies, address water leakage in manifold room and...” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| location.street_limits | Harney Way |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Sunnydale Pump Station Safety Improvements |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Sunnydale Pump Station Safety Improvements” |
| phase | Construction |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2028-01-14 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-01-14T00:00:00.000” |
| schedule.start | 2025-01-15 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-01-15T00:00:00.000” |
| source.project_id | 9769 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9769” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Sunnydale Pump Station Safety Improvements is an active water infrastructure project in San Francisco along... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=8da22166af94fdd25f0775f345ff73b410f5ed931e7df4c96100609115149c84” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 9769 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | The Sunnydale Pump Station Safety Improvements is an active water infrastructure project in San Francisco along Harney Way, owned by SF Public Works' IDC Mechanical division. The work addresses safety risks from groundwater and seawater intrusion by repairing structural deficiencies, fixing water leaks, and replacing corroded HVAC equipment, and it upgrades site security with new lighting, card readers, door contacts, interior sensing, and an intrusion detection system. The project is in the construction phase, which began in January 2025 and is scheduled to run through January 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Harney Way | derived | 2026-07-17 | live |
| schedule.end | 2028-01-14 | reported | 2026-07-17 | live |
| schedule.start | 2025-01-15 | reported | 2026-07-17 | live |
| source.project_id | 9769 | reported | 2026-07-17 | live |
| contact.email | raymond.xu@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Wei Xu | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Mechanical | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Construction | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 1) Address safety risks from groundwater and seawater intrusion: repair all structural deficiencies, address water leakage in manifold room and MCC, repair leaking door, perform electrical repairs, replace corroded HVAC equipment, perform desktop hydraulic analysis 2) Address security concerns: install new security signage and upgrade lighting to dusk-activated LED lighting, upgrade card readers and door contacts at all perimeter doors, add interior presence sensing, connected to an intrusion de | reported | 2026-07-17 | live |
| name | Sunnydale Pump Station Safety Improvements | reported | 2026-07-17 | live |