2021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets
candidate project
Planning
Pre-Planning
593f556c-385f-4f88-8b3b-d1e17e3e3f4e
The San Francisco Public Utilities Commission plans to replace aging 8-inch ductile iron water mains along Diamond Street between 25th and 27th Streets and several nearby side streets in the Noe Valley area, including stretches of 26th, Castro, Clipper, and Douglass Streets. The project is in early pre-planning, with construction scheduled to run from December 2028 to June 2030. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water” |
| description | 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets” |
| location.geometry | 14 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“14 published segment geometries” |
| location.street_limits | 25TH ST from DIAMOND ST to HOFFMAN AVE; 26TH ST from DOUGLASS ST to CASTRO ST; 27TH ST from 27TH ST to CASTRO ST; 27TH ST from SAFIRA LN to 27TH ST; CASTRO ST from 26TH ST to 27TH ST; CESAR CHAVEZ ST; CESAR CHAVEZ ST from CESAR CHAVEZ ST to CESAR CHAVEZ ST; CLIPPER ST from DOUGLASS ST to CASTRO ST; DIAMOND ST from CLIPPER ST to 25TH ST; DIAMOND ST from CLIPPER ST to 27TH ST; DOUGLASS ST from CLIPPER ST to 27TH ST; HOMESTEAD ST from 24TH ST to 25TH ST; NEWBURG ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | 2021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: 2021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2030-06-30 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2030-06-30T00:00:00.000” |
| schedule.start | 2028-12-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2028-12-01T00:00:00.000” |
| source.project_id | 16931 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 16931” |
| status | Pre-Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning” |
| summary | The San Francisco Public Utilities Commission plans to replace aging 8-inch ductile iron water mains along Diamond... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=a459962bbcb1ab43932a50319ad0736e0ba3529192596e16cd34a53c6740c8c6” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 16931 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 14 geometries | reported | 2026-08-27 | live |
| summary | The San Francisco Public Utilities Commission plans to replace aging 8-inch ductile iron water mains along Diamond Street between 25th and 27th Streets and several nearby side streets in the Noe Valley area, including stretches of 26th, Castro, Clipper, and Douglass Streets. The project is in early pre-planning, with construction scheduled to run from December 2028 to June 2030. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 14 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 25TH ST from DIAMOND ST to HOFFMAN AVE; 26TH ST from DOUGLASS ST to CASTRO ST; 27TH ST from 27TH ST to CASTRO ST; 27TH ST from SAFIRA LN to 27TH ST; CASTRO ST from 26TH ST to 27TH ST; CESAR CHAVEZ ST; CESAR CHAVEZ ST from CESAR CHAVEZ ST to CESAR CHAVEZ ST; CLIPPER ST from DOUGLASS ST to CASTRO ST; DIAMOND ST from CLIPPER ST to 25TH ST; DIAMOND ST from CLIPPER ST to 27TH ST; DOUGLASS ST from CLIPPER ST to 27TH ST; HOMESTEAD ST from 24TH ST to 25TH ST; NEWBURG ST | derived | 2026-07-17 | live |
| schedule.end | 2030-06-30 | reported | 2026-07-17 | live |
| schedule.start | 2028-12-01 | reported | 2026-07-17 | live |
| source.project_id | 16931 | reported | 2026-07-17 | live |
| agency.owner | SF PUC Water | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Pre-Planning | reported | 2026-07-17 | live |
| description | 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets | reported | 2026-07-17 | live |
| name | 2021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets | reported | 2026-07-17 | live |