sfproj. every fact links to its evidence

← all projects

WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St

candidate project Design 5840b4c4-c8bb-4d75-a97c-1437bff22556

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
contact.email PDavis@sfwater.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: PDavis@sfwater.org”
contact.name Portia Davis reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Portia Davis”
description Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St”
location.geometry 8 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“8 published segment geometries”
location.street_limits HAWES ST; INGALLS ST; JENNINGS ST; KEITH ST from REVERE AVE to UNDERWOOD AVE; LANE ST; SHAFTER AVE; THOMAS AVE; UNDERWOOD AVE derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2029-08-04 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-08-04T00:00:00.000”
schedule.start 2027-08-04 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-08-04T00:00:00.000”
source.project_id 36616 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 36616”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”

Source records

Public Works coordinated projects (DotMaps) key 36616 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 8 geometries reported 2026-07-17 live
location.street_limits HAWES ST; INGALLS ST; JENNINGS ST; KEITH ST from REVERE AVE to UNDERWOOD AVE; LANE ST; SHAFTER AVE; THOMAS AVE; UNDERWOOD AVE derived 2026-07-17 live
schedule.end 2029-08-04 reported 2026-07-17 live
schedule.start 2027-08-04 reported 2026-07-17 live
source.project_id 36616 reported 2026-07-17 live
contact.email PDavis@sfwater.org reported 2026-07-17 live
contact.name Portia Davis reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St reported 2026-07-17 live
name WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith St reported 2026-07-17 live