Amador Street Improvements Phase 2
candidate project
Construction
57c43319-1cd6-40be-8198-7facbfd2d73e
The Amador Street Improvements Phase 2 is a San Francisco Public Works infrastructure project along Amador Street that is currently in the construction phase. The work includes reconstructing the roadway to current city pavement standards, replacing the sewer and upgrading pump stations for added capacity and reliability, upgrading stormwater systems, replacing the water main, removing creosote-treated rail ties, installing storm drain capture devices, and adding drought-tolerant landscaping. Construction began in March 2025 and is scheduled to be completed by December 2026. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| description | 2370i_THE AMADOR STREET INFRASTRUCTURE IMPROVEMENTS PROJECT CONSISTS OF: ROADWAY RECONSTRUCTION TO CURRENT CITY AND COUNTY OF SAN FRANCISCO STANDARD PAVEMENT DESIGN, SEWER REPLACEMENT AND PUMP STATION UPGRADES TO PROVIDE ADDITIONAL CAPACITY AND RELIABILITY, STORMWATER SYSTEMS UPGRADES, WATER MAIN REPLACEMENT, REMOVAL OF CREOSOTE-TREATED RAIL TIES TO IMPROVE ENVIRONMENTAL CONDITIONS, INSTALLING STORM DRAIN CAPTURE DEVICES, AND LANDSCAPING WITH DROUGHT TOLERANT PLANTS THAT WILL CONSERVE WATER. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2370i_THE AMADOR STREET INFRASTRUCTURE IMPROVEMENTS PROJECT CONSISTS OF: ROADWAY RECONSTRUCTION TO CURRENT CITY AND COUNTY OF SAN FRANCISCO...” |
| location.geometry | 5 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“5 published segment geometries” |
| location.street_limits | Amador St; Error |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Amador Street Improvements Phase 2 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Amador Street Improvements Phase 2” |
| phase | Construction |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction” |
| project_type | Sanitary Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer” |
| schedule.end | 2026-12-15 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-12-15T00:00:00.000” |
| schedule.start | 2025-03-17 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-03-17T00:00:00.000” |
| source.project_id | 12497 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 12497” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Amador Street Improvements Phase 2 is a San Francisco Public Works infrastructure project along Amador Street... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=0cccc8d1deb4e46545e5ed9d11ba265a365c0fed5c3a6f4c0a7691fd39fbf9fa” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 12497 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 5 geometries | reported | 2026-08-27 | live |
| summary | The Amador Street Improvements Phase 2 is a San Francisco Public Works infrastructure project along Amador Street that is currently in the construction phase. The work includes reconstructing the roadway to current city pavement standards, replacing the sewer and upgrading pump stations for added capacity and reliability, upgrading stormwater systems, replacing the water main, removing creosote-treated rail ties, installing storm drain capture devices, and adding drought-tolerant landscaping. Construction began in March 2025 and is scheduled to be completed by December 2026. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 5 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Amador St; Error | derived | 2026-07-17 | live |
| schedule.end | 2026-12-15 | reported | 2026-07-17 | live |
| schedule.start | 2025-03-17 | reported | 2026-07-17 | live |
| source.project_id | 12497 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer | reported | 2026-07-17 | live |
| phase | Construction | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 2370i_THE AMADOR STREET INFRASTRUCTURE IMPROVEMENTS PROJECT CONSISTS OF: ROADWAY RECONSTRUCTION TO CURRENT CITY AND COUNTY OF SAN FRANCISCO STANDARD PAVEMENT DESIGN, SEWER REPLACEMENT AND PUMP STATION UPGRADES TO PROVIDE ADDITIONAL CAPACITY AND RELIABILITY, STORMWATER SYSTEMS UPGRADES, WATER MAIN REPLACEMENT, REMOVAL OF CREOSOTE-TREATED RAIL TIES TO IMPROVE ENVIRONMENTAL CONDITIONS, INSTALLING STORM DRAIN CAPTURE DEVICES, AND LANDSCAPING WITH DROUGHT TOLERANT PLANTS THAT WILL CONSERVE WATER. | reported | 2026-07-17 | live |
| name | Amador Street Improvements Phase 2 | reported | 2026-07-17 | live |