sfproj. every fact links to its evidence

← all projects

Amador Street Improvements Phase 2

candidate project Construction 57c43319-1cd6-40be-8198-7facbfd2d73e

The Amador Street Improvements Phase 2 is a San Francisco Public Works infrastructure project along Amador Street that is currently in the construction phase. The work includes reconstructing the roadway to current city pavement standards, replacing the sewer and upgrading pump stations for added capacity and reliability, upgrading stormwater systems, replacing the water main, removing creosote-treated rail ties, installing storm drain capture devices, and adding drought-tolerant landscaping. Construction began in March 2025 and is scheduled to be completed by December 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description 2370i_THE AMADOR STREET INFRASTRUCTURE IMPROVEMENTS PROJECT CONSISTS OF: ROADWAY RECONSTRUCTION TO CURRENT CITY AND COUNTY OF SAN FRANCISCO STANDARD PAVEMENT DESIGN, SEWER REPLACEMENT AND PUMP STATION UPGRADES TO PROVIDE ADDITIONAL CAPACITY AND RELIABILITY, STORMWATER SYSTEMS UPGRADES, WATER MAIN REPLACEMENT, REMOVAL OF CREOSOTE-TREATED RAIL TIES TO IMPROVE ENVIRONMENTAL CONDITIONS, INSTALLING STORM DRAIN CAPTURE DEVICES, AND LANDSCAPING WITH DROUGHT TOLERANT PLANTS THAT WILL CONSERVE WATER. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2370i_THE AMADOR STREET INFRASTRUCTURE IMPROVEMENTS PROJECT CONSISTS OF: ROADWAY RECONSTRUCTION TO CURRENT CITY AND COUNTY OF SAN FRANCISCO...”
location.geometry 5 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“5 published segment geometries”
location.street_limits Amador St; Error derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Amador Street Improvements Phase 2 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Amador Street Improvements Phase 2”
phase Construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2026-12-15 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-12-15T00:00:00.000”
schedule.start 2025-03-17 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-03-17T00:00:00.000”
source.project_id 12497 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 12497”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Amador Street Improvements Phase 2 is a San Francisco Public Works infrastructure project along Amador Street... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=0cccc8d1deb4e46545e5ed9d11ba265a365c0fed5c3a6f4c0a7691fd39fbf9fa”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.37992757756851, 37.74607114789034], [-122.38185650577705, 37.74597216305011], [-122.38268493085148, 37.74595814080646], [-122.3860601871643, 37.745756990456655]]}, {'type': 'LineString', 'coordinates': [[-122.3860601871643, 37.745756990456655], [-122.3862658160038, 37.74574473250017]]}, {'type': 'Point', 'coordinates': [-122.37992757773739, 37.746071147952506]}, {'type': 'Point', 'coordinates': [-122.38626581595136, 37.74574473256587]}, {'type': 'Point', 'coordinates': [-122.38606018732872, 37.74575699034309]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.37992758, 37.74607115], [-122.38185651, 37.74597216], [-122.38268493, 37.74595814], [-122.38606019, 37.74575699]]}, {'type': 'LineString', 'coordinates': [[-122.38606019, 37.74575699], [-122.38626582, 37.74574473]]}, {'type': 'Point', 'coordinates': [-122.37992758, 37.74607115]}, {'type': 'Point', 'coordinates': [-122.38626582, 37.74574473]}, {'type': 'Point', 'coordinates': [-122.38606019, 37.74575699]}]}

Source records

Public Works coordinated projects (DotMaps) key 12497 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 5 geometries reported 2026-08-27 live
summary The Amador Street Improvements Phase 2 is a San Francisco Public Works infrastructure project along Amador Street that is currently in the construction phase. The work includes reconstructing the roadway to current city pavement standards, replacing the sewer and upgrading pump stations for added capacity and reliability, upgrading stormwater systems, replacing the water main, removing creosote-treated rail ties, installing storm drain capture devices, and adding drought-tolerant landscaping. Construction began in March 2025 and is scheduled to be completed by December 2026. No cost figures have been published. generated 2026-07-18 live
location.geometry 5 geometries reported 2026-07-17 superseded
location.street_limits Amador St; Error derived 2026-07-17 live
schedule.end 2026-12-15 reported 2026-07-17 live
schedule.start 2025-03-17 reported 2026-07-17 live
source.project_id 12497 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Construction reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2370i_THE AMADOR STREET INFRASTRUCTURE IMPROVEMENTS PROJECT CONSISTS OF: ROADWAY RECONSTRUCTION TO CURRENT CITY AND COUNTY OF SAN FRANCISCO STANDARD PAVEMENT DESIGN, SEWER REPLACEMENT AND PUMP STATION UPGRADES TO PROVIDE ADDITIONAL CAPACITY AND RELIABILITY, STORMWATER SYSTEMS UPGRADES, WATER MAIN REPLACEMENT, REMOVAL OF CREOSOTE-TREATED RAIL TIES TO IMPROVE ENVIRONMENTAL CONDITIONS, INSTALLING STORM DRAIN CAPTURE DEVICES, AND LANDSCAPING WITH DROUGHT TOLERANT PLANTS THAT WILL CONSERVE WATER. reported 2026-07-17 live
name Amador Street Improvements Phase 2 reported 2026-07-17 live