sfproj. every fact links to its evidence

← all projects

PW Various Locations Sewer Replacement (JV VL PR Concrete No 88)

candidate project Design 540c893f-8cd5-4d5e-91ed-85b19a818d8c

This is an active sanitary sewer replacement project managed by San Francisco Public Works (Hydraulic division) at several locations, including Bret Harte Terrace, Frederick Street, and a stretch of Willard Street. Currently in the design phase, construction is scheduled to run from February 2029 to May 2030. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description 2617i reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2617i”
location.geometry 4 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“4 published segment geometries”
location.street_limits Bret Harte Ter; Bret Harte Ter from Francisco St to End; Frederick St; Willard St from Frederick St to Carl St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name PW Various Locations Sewer Replacement (JV VL PR Concrete No 88) reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW Various Locations Sewer Replacement (JV VL PR Concrete No 88)”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2030-05-13 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2030-05-13T00:00:00.000”
schedule.start 2029-02-28 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2029-02-28T00:00:00.000”
source.project_id 63608 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63608”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary This is an active sanitary sewer replacement project managed by San Francisco Public Works (Hydraulic division) at... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=5b5c4cf2d5d65840a0b695a61c819235fd3de79c5809adf3b76d3d4616fdb111”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.45459292286502, 37.76616547011662], [-122.45440402189878, 37.765232926774274]]}, {'type': 'Point', 'coordinates': [-122.41748390611833, 37.80417781312432]}, {'type': 'Point', 'coordinates': [-122.45459292302937, 37.76616547000295]}, {'type': 'LineString', 'coordinates': [[-122.41748390595384, 37.80417781323793], [-122.4176026578996, 37.80476313813011], [-122.4178737592384, 37.80472830794723]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.45459292, 37.76616547], [-122.45440402, 37.76523293]]}, {'type': 'Point', 'coordinates': [-122.41748391, 37.80417781]}, {'type': 'Point', 'coordinates': [-122.45459292, 37.76616547]}, {'type': 'LineString', 'coordinates': [[-122.41748391, 37.80417781], [-122.41760266, 37.80476314], [-122.41787376, 37.80472831]]}]}

Source records

Public Works coordinated projects (DotMaps) key 63608 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 4 geometries reported 2026-08-27 live
summary This is an active sanitary sewer replacement project managed by San Francisco Public Works (Hydraulic division) at several locations, including Bret Harte Terrace, Frederick Street, and a stretch of Willard Street. Currently in the design phase, construction is scheduled to run from February 2029 to May 2030. No cost figures have been published. generated 2026-07-18 live
location.geometry 4 geometries reported 2026-07-17 superseded
location.street_limits Bret Harte Ter; Bret Harte Ter from Francisco St to End; Frederick St; Willard St from Frederick St to Carl St derived 2026-07-17 live
schedule.end 2030-05-13 reported 2026-07-17 live
schedule.start 2029-02-28 reported 2026-07-17 live
source.project_id 63608 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2617i reported 2026-07-17 live
name PW Various Locations Sewer Replacement (JV VL PR Concrete No 88) reported 2026-07-17 live