Various Locations Pavement Renovation Under Overhead Contact System No 4
candidate project
Planning
Pre-Planning
52644ff6-45a2-4a81-ab58-2637e9812bfa
This is a roadway paving project managed by San Francisco Public Works' Streets & Highways division, covering numerous blocks across the city that fall under the overhead contact system (the wires used by electric transit). The work spans dozens of street segments, including stretches of 14th Street, Ashbury Street, Eddy Street, and Buchanan Street, among others. The project is in pre-planning, with construction scheduled to run from February 2035 to April 2036. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Streets & Highways |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways” |
| contact.email | Paul.Barradas@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Paul.Barradas@sfdpw.org” |
| contact.name | Paul Barradas |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Paul Barradas” |
| description | Various Locations blocks with OCS |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Various Locations blocks with OCS” |
| location.geometry | 51 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“51 published segment geometries” |
| location.street_limits | 14th St; 14th St from Minna St to Mission St; 14th St from Natoma St to Minna St; 14th St from South Van Ness Ave to Natoma St; Arbol Ln; Ashbury St; Ashbury St from Frederick St to Piedmont St; Ashbury St from Haight St to Waller St; Ashbury St from Piedmont St to Clifford Ter; Ashbury St from Waller St to Frederick St; Baker St; Balboa St from Funston Ave to Park Presidio Blvd; Buchanan St from Haight St to Rose St; Buchanan St from Rose St to Page St; Central Ave; Downey St; Eddy St; Eddy St from Hyde St to Larkin St; Eddy St from Jones St to Wagner Aly; Eddy St from Larkin St to Polk St … |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Various Locations Pavement Renovation Under Overhead Contact System No 4 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Pavement Renovation Under Overhead Contact System No 4” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2036-04-16 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2036-04-16T00:00:00.000” |
| schedule.start | 2035-02-02 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2035-02-02T00:00:00.000” |
| source.project_id | 31458 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 31458” |
| status | Pre-Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning” |
| summary | This is a roadway paving project managed by San Francisco Public Works' Streets & Highways division, covering... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=fd079ae4f62b39ef13c046efdc3afbe68ad89cc2ebaf3817a72d18d79125eb01” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 31458 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 51 geometries | reported | 2026-08-27 | live |
| summary | This is a roadway paving project managed by San Francisco Public Works' Streets & Highways division, covering numerous blocks across the city that fall under the overhead contact system (the wires used by electric transit). The work spans dozens of street segments, including stretches of 14th Street, Ashbury Street, Eddy Street, and Buchanan Street, among others. The project is in pre-planning, with construction scheduled to run from February 2035 to April 2036. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 51 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 14th St; 14th St from Minna St to Mission St; 14th St from Natoma St to Minna St; 14th St from South Van Ness Ave to Natoma St; Arbol Ln; Ashbury St; Ashbury St from Frederick St to Piedmont St; Ashbury St from Haight St to Waller St; Ashbury St from Piedmont St to Clifford Ter; Ashbury St from Waller St to Frederick St; Baker St; Balboa St from Funston Ave to Park Presidio Blvd; Buchanan St from Haight St to Rose St; Buchanan St from Rose St to Page St; Central Ave; Downey St; Eddy St; Eddy St from Hyde St to Larkin St; Eddy St from Jones St to Wagner Aly; Eddy St from Larkin St to Polk St … | derived | 2026-07-17 | live |
| schedule.end | 2036-04-16 | reported | 2026-07-17 | live |
| schedule.start | 2035-02-02 | reported | 2026-07-17 | live |
| source.project_id | 31458 | reported | 2026-07-17 | live |
| contact.email | Paul.Barradas@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Paul Barradas | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Streets & Highways | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Pre-Planning | reported | 2026-07-17 | live |
| description | Various Locations blocks with OCS | reported | 2026-07-17 | live |
| name | Various Locations Pavement Renovation Under Overhead Contact System No 4 | reported | 2026-07-17 | live |