This is a roadway project at the 18th Street and Rhode Island Street intersection in San Francisco, led by the San Francisco Water Department in coordination with Public Works' Streets & Highways division. The intersection work was moved out of a Hunters Point project into this joint effort. It remains in early pre-planning, with construction tentatively scheduled to run from February 2026 to January 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Ramon.Kong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Ramon.Kong@sfdpw.org”
contact.name Ramon Kong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Ramon Kong”
description 18th and Rhode Island intersection moved from Hunters Pt project reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 18th and Rhode Island intersection moved from Hunters Pt project”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits 18th St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Joint - SFWD Lead - WD-2919 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Joint - SFWD Lead - WD-2919”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2028-01-16 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-01-16T00:00:00.000”
schedule.start 2026-02-16 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-02-16T00:00:00.000”
source.project_id 56977 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 56977”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary This is a roadway project at the 18th Street and Rhode Island Street intersection in San Francisco, led by the San... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=5ea5e7db5333eb41e027d367ae1d0e6a93d3bf589c5faa83fca86a22f8f6dcb5”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40232695360676, 37.762229393830886]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40232695, 37.76222939]}]}

Source records

Public Works coordinated projects (DotMaps) key 56977 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary This is a roadway project at the 18th Street and Rhode Island Street intersection in San Francisco, led by the San Francisco Water Department in coordination with Public Works' Streets & Highways division. The intersection work was moved out of a Hunters Point project into this joint effort. It remains in early pre-planning, with construction tentatively scheduled to run from February 2026 to January 2028. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits 18th St derived 2026-07-17 live
schedule.end 2028-01-16 reported 2026-07-17 live
schedule.start 2026-02-16 reported 2026-07-17 live
source.project_id 56977 reported 2026-07-17 live
contact.email Ramon.Kong@sfdpw.org reported 2026-07-17 live
contact.name Ramon Kong reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description 18th and Rhode Island intersection moved from Hunters Pt project reported 2026-07-17 live
name Joint - SFWD Lead - WD-2919 reported 2026-07-17 live