Downtown Coastal Resilience Project
candidate project
Planning
486cf9b4-d152-4c30-a92a-972a8358d12e
The Downtown Coastal Resilience Project is an early flood-protection effort under the SF Port's Waterfront Resilience Program, aimed at reducing coastal flood risk along the downtown waterfront between Vallejo and Harrison Streets. Owned by the Port and currently in the planning phase, the active project also includes roadway and sewer work and is scheduled to run from October 2025 through the end of 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF Port |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF Port” |
| contact.email | wendy.proctor@sfport.com |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: wendy.proctor@sfport.com” |
| contact.name | Wendy Proctor |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Wendy Proctor” |
| description | The Downtown Coastal Resilience Project is an early project under the Port’s Waterfront Resilience Program to reduce coastal flood risk between Vallejo and Harrison Streets. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: The Downtown Coastal Resilience Project is an early project under the Port’s Waterfront Resilience Program to reduce coastal flood risk between...” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| name | Downtown Coastal Resilience Project |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Downtown Coastal Resilience Project” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Flood Protection, Roadway, Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Flood Protection, Roadway, Sewer” |
| schedule.end | 2028-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-12-31T00:00:00.000” |
| schedule.start | 2025-10-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-10-01T00:00:00.000” |
| source.project_id | 13178 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 13178” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Downtown Coastal Resilience Project is an early flood-protection effort under the SF Port's Waterfront... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 12 resolved fields; input sha256-v2=a4ff78cf9b7d012dc8ebdabe4dbcfd4553199b1d26fd41dfc5ef9a8ff55602ec” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 13178 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | The Downtown Coastal Resilience Project is an early flood-protection effort under the SF Port's Waterfront Resilience Program, aimed at reducing coastal flood risk along the downtown waterfront between Vallejo and Harrison Streets. Owned by the Port and currently in the planning phase, the active project also includes roadway and sewer work and is scheduled to run from October 2025 through the end of 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| schedule.end | 2028-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2025-10-01 | reported | 2026-07-17 | live |
| source.project_id | 13178 | reported | 2026-07-17 | live |
| contact.email | wendy.proctor@sfport.com | reported | 2026-07-17 | live |
| contact.name | Wendy Proctor | reported | 2026-07-17 | live |
| agency.owner | SF Port | reported | 2026-07-17 | live |
| project_type | Flood Protection, Roadway, Sewer | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | The Downtown Coastal Resilience Project is an early project under the Port’s Waterfront Resilience Program to reduce coastal flood risk between Vallejo and Harrison Streets. | reported | 2026-07-17 | live |
| name | Downtown Coastal Resilience Project | reported | 2026-07-17 | live |