1415-009: 8-inch Ductile Iron Water Main Replacement on Douglass St from Carson St to 23rd St, 22nd St from Worth to Castro St, and Various Side Streets

candidate project Planning Pre-Planning 4280d510-7577-4d17-97e9-2cedd2ca3814

The San Francisco Public Utilities Commission's Water division plans to replace aging 8-inch ductile iron water mains along Douglass, 22nd, and several nearby side streets in the Noe Valley/Eureka Valley area. The project is in pre-planning, with construction scheduled to run from August 2029 to December 2030. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
description 8-inch Ductile Iron Water Main Replacement on Douglass St from Carson St to 23rd St, 22nd St from Worth to Castro St, and Various Side Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-inch Ductile Iron Water Main Replacement on Douglass St from Carson St to 23rd St, 22nd St from Worth to Castro St, and Various Side Streets”
location.geometry 11 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“11 published segment geometries”
location.street_limits 20TH ST; 21ST ST; 22ND ST; 22ND ST from WORTH ST to DIAMOND ST; CARSON ST; COLLINGWOOD ST from 21ST ST to 22ND ST; DIAMOND ST; DOUGLASS ST; WORTH ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name 1415-009: 8-inch Ductile Iron Water Main Replacement on Douglass St from Carson St to 23rd St, 22nd St from Worth to Castro St, and Various Side Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: 1415-009: 8-inch Ductile Iron Water Main Replacement on Douglass St from Carson St to 23rd St, 22nd St from Worth to Castro St, and Various Side Streets”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2030-12-29 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2030-12-29T00:00:00.000”
schedule.start 2029-08-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2029-08-01T00:00:00.000”
source.project_id 9115 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9115”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary The San Francisco Public Utilities Commission's Water division plans to replace aging 8-inch ductile iron water... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=33da7457b542129e4e43952c3eecac1aab8c2fa4fab27209d4c0e81c3b3c28f7”

Source records

Public Works coordinated projects (DotMaps) key 9115 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary The San Francisco Public Utilities Commission's Water division plans to replace aging 8-inch ductile iron water mains along Douglass, 22nd, and several nearby side streets in the Noe Valley/Eureka Valley area. The project is in pre-planning, with construction scheduled to run from August 2029 to December 2030. No cost figures have been published. generated 2026-07-17 live
location.geometry 11 geometries reported 2026-07-17 live
location.street_limits 20TH ST; 21ST ST; 22ND ST; 22ND ST from WORTH ST to DIAMOND ST; CARSON ST; COLLINGWOOD ST from 21ST ST to 22ND ST; DIAMOND ST; DOUGLASS ST; WORTH ST derived 2026-07-17 live
schedule.end 2030-12-29 reported 2026-07-17 live
schedule.start 2029-08-01 reported 2026-07-17 live
source.project_id 9115 reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description 8-inch Ductile Iron Water Main Replacement on Douglass St from Carson St to 23rd St, 22nd St from Worth to Castro St, and Various Side Streets reported 2026-07-17 live
name 1415-009: 8-inch Ductile Iron Water Main Replacement on Douglass St from Carson St to 23rd St, 22nd St from Worth to Castro St, and Various Side Streets reported 2026-07-17 live