2021-004: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets
candidate project
Planning
Pre-Planning
3c49f7d5-4718-47fc-b4a0-17c6b385c928
This is a San Francisco Public Utilities Commission water project to replace roughly 8-inch ductile iron water mains in the Potrero Hill area, covering San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina streets between 18th and 22nd Streets along with several side streets. The project is in early planning (pre-planning) stages, with construction scheduled to run from June 2027 to June 2029. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water” |
| description | 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and...” |
| location.geometry | 9 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“9 published segment geometries” |
| location.street_limits | 19TH ST; 19TH ST from RHODE ISLAND ST to 19TH ST; 20TH ST; CAROLINA ST; DE HARO ST; KANSAS ST; RHODE ISLAND ST; SAN BRUNO AVE from 18TH ST to 20TH ST; VERMONT ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | 2021-004: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: 2021-004: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and...” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2029-06-04 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-06-04T00:00:00.000” |
| schedule.start | 2027-06-02 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-06-02T00:00:00.000” |
| source.project_id | 9102 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9102” |
| status | Pre-Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning” |
| summary | This is a San Francisco Public Utilities Commission water project to replace roughly 8-inch ductile iron water mains... |
generated
llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=3f4ed62015f2352ba2fedee7a4cfdbd8385b946964ea12775c766b35b067cc4b” |
Source records
| Public Works coordinated projects (DotMaps) | key 9102 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| summary | This is a San Francisco Public Utilities Commission water project to replace roughly 8-inch ductile iron water mains in the Potrero Hill area, covering San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina streets between 18th and 22nd Streets along with several side streets. The project is in early planning (pre-planning) stages, with construction scheduled to run from June 2027 to June 2029. No cost figures have been published. | generated | 2026-07-17 | live |
| location.geometry | 9 geometries | reported | 2026-07-17 | live |
| location.street_limits | 19TH ST; 19TH ST from RHODE ISLAND ST to 19TH ST; 20TH ST; CAROLINA ST; DE HARO ST; KANSAS ST; RHODE ISLAND ST; SAN BRUNO AVE from 18TH ST to 20TH ST; VERMONT ST | derived | 2026-07-17 | live |
| schedule.end | 2029-06-04 | reported | 2026-07-17 | live |
| schedule.start | 2027-06-02 | reported | 2026-07-17 | live |
| source.project_id | 9102 | reported | 2026-07-17 | live |
| agency.owner | SF PUC Water | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Pre-Planning | reported | 2026-07-17 | live |
| description | 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets | reported | 2026-07-17 | live |
| name | 2021-004: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets | reported | 2026-07-17 | live |