2021-004: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets

candidate project Planning Pre-Planning 3c49f7d5-4718-47fc-b4a0-17c6b385c928

This is a San Francisco Public Utilities Commission water project to replace roughly 8-inch ductile iron water mains in the Potrero Hill area, covering San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina streets between 18th and 22nd Streets along with several side streets. The project is in early planning (pre-planning) stages, with construction scheduled to run from June 2027 to June 2029. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
description 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and...”
location.geometry 9 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“9 published segment geometries”
location.street_limits 19TH ST; 19TH ST from RHODE ISLAND ST to 19TH ST; 20TH ST; CAROLINA ST; DE HARO ST; KANSAS ST; RHODE ISLAND ST; SAN BRUNO AVE from 18TH ST to 20TH ST; VERMONT ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name 2021-004: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: 2021-004: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and...”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2029-06-04 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-06-04T00:00:00.000”
schedule.start 2027-06-02 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-06-02T00:00:00.000”
source.project_id 9102 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9102”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary This is a San Francisco Public Utilities Commission water project to replace roughly 8-inch ductile iron water mains... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=3f4ed62015f2352ba2fedee7a4cfdbd8385b946964ea12775c766b35b067cc4b”

Source records

Public Works coordinated projects (DotMaps) key 9102 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary This is a San Francisco Public Utilities Commission water project to replace roughly 8-inch ductile iron water mains in the Potrero Hill area, covering San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina streets between 18th and 22nd Streets along with several side streets. The project is in early planning (pre-planning) stages, with construction scheduled to run from June 2027 to June 2029. No cost figures have been published. generated 2026-07-17 live
location.geometry 9 geometries reported 2026-07-17 live
location.street_limits 19TH ST; 19TH ST from RHODE ISLAND ST to 19TH ST; 20TH ST; CAROLINA ST; DE HARO ST; KANSAS ST; RHODE ISLAND ST; SAN BRUNO AVE from 18TH ST to 20TH ST; VERMONT ST derived 2026-07-17 live
schedule.end 2029-06-04 reported 2026-07-17 live
schedule.start 2027-06-02 reported 2026-07-17 live
source.project_id 9102 reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets reported 2026-07-17 live
name 2021-004: 8-inch Ductile Iron Water Main Replacement on San Bruno, Vermont, Kansas, Rhode Island, De Haro and Carolina from 22nd to 18th Street and Various Side Streets reported 2026-07-17 live