Stormwater Trash Capture Phase 2
candidate project
Planning
Pre-Planning
3acd8657-4e3f-405e-8e38-4dc9068f2322
Stormwater Trash Capture Phase 2 is a planned San Francisco Public Works project to install trash capture devices on stormwater systems within Port jurisdiction, reducing trash discharges into San Francisco Bay and helping the city comply with California State Water Resources Control Board Trash Provisions. Owned by the Public Works Hydraulic division, the work spans stormwater lines along waterfront and eastern streets including Third, King, and Marin. The project is still in pre-planning, with construction scheduled to run from late 2027 to mid-2028. No cost estimate has been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Jose.Flores@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Jose.Flores@sfdpw.org” |
| contact.name | Jose Flores |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Jose Flores” |
| description | Installation of trash capture devices on stormwater systems within Port Jurisdiction to reduce trash discharges into San Francisco Bay waters and to comply with the California State Water Resources Control Board Trash Provisions. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Installation of trash capture devices on stormwater systems within Port Jurisdiction to reduce trash discharges into San Francisco Bay waters...” |
| location.geometry | 40 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“40 published segment geometries” |
| location.street_limits | 03rd St; 03rd St from Berry St to Mission Creek; 03rd St from King St to Berry St; 16th St; China Basin St; Error; Folsom St; Green St; Harrison St; Illinois St; Jefferson St; King St; King St from The Embarcadero \ Townsend St to 02nd St; Marin St; Marin St from End to Michigan St; Marin St from Michigan St to Illinois St; Mission Bay Blvd; Mission Rock St; Taylor St from Jefferson St to The Embarcadero; Terry A Francois Blvd … |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Stormwater Trash Capture Phase 2 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Stormwater Trash Capture Phase 2” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Sanitary Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer” |
| schedule.end | 2028-07-29 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-07-29T00:00:00.000” |
| schedule.start | 2027-11-29 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-11-29T00:00:00.000” |
| source.project_id | 52357 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 52357” |
| status | Pre-Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning” |
| summary | Stormwater Trash Capture Phase 2 is a planned San Francisco Public Works project to install trash capture devices on... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=f5b7b44e0e837c56c1df3e6b1327f2087dba148cd60bf9042491dfbe35fb7552” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 52357 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 40 geometries | reported | 2026-08-27 | live |
| summary | Stormwater Trash Capture Phase 2 is a planned San Francisco Public Works project to install trash capture devices on stormwater systems within Port jurisdiction, reducing trash discharges into San Francisco Bay and helping the city comply with California State Water Resources Control Board Trash Provisions. Owned by the Public Works Hydraulic division, the work spans stormwater lines along waterfront and eastern streets including Third, King, and Marin. The project is still in pre-planning, with construction scheduled to run from late 2027 to mid-2028. No cost estimate has been published. | generated | 2026-07-18 | live |
| location.geometry | 40 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 03rd St; 03rd St from Berry St to Mission Creek; 03rd St from King St to Berry St; 16th St; China Basin St; Error; Folsom St; Green St; Harrison St; Illinois St; Jefferson St; King St; King St from The Embarcadero \ Townsend St to 02nd St; Marin St; Marin St from End to Michigan St; Marin St from Michigan St to Illinois St; Mission Bay Blvd; Mission Rock St; Taylor St from Jefferson St to The Embarcadero; Terry A Francois Blvd … | derived | 2026-07-17 | live |
| schedule.end | 2028-07-29 | reported | 2026-07-17 | live |
| schedule.start | 2027-11-29 | reported | 2026-07-17 | live |
| source.project_id | 52357 | reported | 2026-07-17 | live |
| contact.email | Jose.Flores@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Jose Flores | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Pre-Planning | reported | 2026-07-17 | live |
| description | Installation of trash capture devices on stormwater systems within Port Jurisdiction to reduce trash discharges into San Francisco Bay waters and to comply with the California State Water Resources Control Board Trash Provisions. | reported | 2026-07-17 | live |
| name | Stormwater Trash Capture Phase 2 | reported | 2026-07-17 | live |