Western Addition Area Traffic Signal Upgrades Phase 2
candidate project
Design
2fcfaaaf-8748-433d-8c2c-9d15ac2c3fc1
The Western Addition Area Traffic Signal Upgrades Phase 2 is an active roadway project led by the SFMTA's Transportation Engineering division to modernize traffic signals at 16 locations across the Western Addition neighborhood, along corridors including Divisadero, Fillmore, and McAllister streets. The work covers new mast arms, signal heads, controllers, and wiring, along with pedestrian countdown and accessible audible signals, rectangular flashing beacons, radar speed signs, streetlighting, and curb ramps. Currently in the design phase, the project is scheduled to run from June 2025 through the end of 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF MTA SS - Transportation Engineering (Capital) |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Transportation Engineering (Capital)” |
| contact.email | geraldine.deleon@sfmta.com |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: geraldine.deleon@sfmta.com” |
| contact.name | Geraldine de Leon |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Geraldine de Leon” |
| description | Upgrade traffic signals at 16 locations in the Western Addition neighborhood: traffic signals (mast arms, signal heads, controllers, conduit, wiring, and poles), pedestrian countdown signals, accessible (audible) pedestrian signals, rectangular flashing beacons, radar speed signs, streetlighting, and curb ramps. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Upgrade traffic signals at 16 locations in the Western Addition neighborhood: traffic signals (mast arms, signal heads, controllers, conduit,...” |
| location.geometry | 16 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“16 published segment geometries” |
| location.street_limits | BRODERICK ST; DIVISADERO ST; FILLMORE ST; MCALLISTER ST; OFARRELL ST; SCOTT ST; TURK ST; WEBSTER ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Western Addition Area Traffic Signal Upgrades Phase 2 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Western Addition Area Traffic Signal Upgrades Phase 2” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2028-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-12-31T00:00:00.000” |
| schedule.start | 2025-06-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-06-01T00:00:00.000” |
| source.project_id | 31773 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 31773” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Western Addition Area Traffic Signal Upgrades Phase 2 is an active roadway project led by the SFMTA's... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=859f8ae13b807a7c8f974d77a78814f6a2eaabe5e678da176fdcc3a9d6be0cf2” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 31773 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 16 geometries | reported | 2026-08-27 | live |
| summary | The Western Addition Area Traffic Signal Upgrades Phase 2 is an active roadway project led by the SFMTA's Transportation Engineering division to modernize traffic signals at 16 locations across the Western Addition neighborhood, along corridors including Divisadero, Fillmore, and McAllister streets. The work covers new mast arms, signal heads, controllers, and wiring, along with pedestrian countdown and accessible audible signals, rectangular flashing beacons, radar speed signs, streetlighting, and curb ramps. Currently in the design phase, the project is scheduled to run from June 2025 through the end of 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 16 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | BRODERICK ST; DIVISADERO ST; FILLMORE ST; MCALLISTER ST; OFARRELL ST; SCOTT ST; TURK ST; WEBSTER ST | derived | 2026-07-17 | live |
| schedule.end | 2028-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2025-06-01 | reported | 2026-07-17 | live |
| source.project_id | 31773 | reported | 2026-07-17 | live |
| contact.email | geraldine.deleon@sfmta.com | reported | 2026-07-17 | live |
| contact.name | Geraldine de Leon | reported | 2026-07-17 | live |
| agency.owner | SF MTA SS - Transportation Engineering (Capital) | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Upgrade traffic signals at 16 locations in the Western Addition neighborhood: traffic signals (mast arms, signal heads, controllers, conduit, wiring, and poles), pedestrian countdown signals, accessible (audible) pedestrian signals, rectangular flashing beacons, radar speed signs, streetlighting, and curb ramps. | reported | 2026-07-17 | live |
| name | Western Addition Area Traffic Signal Upgrades Phase 2 | reported | 2026-07-17 | live |