Various Locations Sewer Replacement No 33
candidate project
Design
2b49612b-75fc-47b5-84f2-1c639a2115b3
Various Locations Sewer Replacement No. 33 is an active sanitary sewer project managed by San Francisco Public Works' Hydraulic Engineering division, replacing sewer lines at roughly 18 sites across the Richmond, Inner Sunset, and Laurel Heights areas, including stretches of Golden Gate Avenue, Geary Boulevard, and Lake Street. The project is currently in the design phase, with construction scheduled to run from June 2028 to May 2029. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| description | 2687i |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2687i” |
| location.geometry | 18 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“18 published segment geometries” |
| location.street_limits | 02nd Ave from Hugo St to Irving St; 06th Ave from Hugo St to Irving St; 19th Ave from Cabrillo St to Fulton St; 24th Ave from Clement St to Geary Blvd; 26th Ave from El Camino Del Mar to Lake St; Anza St from 43rd Ave to 44th Ave; Cabrillo St from 21st Ave to 22nd Ave; Euclid Ave from Masonic Ave \ Walnut St to Laurel St; Geary Blvd from 39th Ave to 40th Ave; Golden Gate Ave from Annapolis Ter to Tamalpais Ter; Golden Gate Ave from Central Ave to Masonic Ave; Golden Gate Ave from Roselyn Ter to Kittredge Ter; Golden Gate Ave from Tamalpais Ter to Roselyn Ter; Lake St from 28th Ave to 29th Ave; Lyon St from Pine St to California St; Sutter St from Broderick St to Baker St; Turk Blvd from Central Ave to Nido Ave; Willard St from Mcallister St to Fulton St |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Various Locations Sewer Replacement No 33 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Sewer Replacement No 33” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Sanitary Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer” |
| schedule.end | 2029-05-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-05-31T00:00:00.000” |
| schedule.start | 2028-06-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2028-06-01T00:00:00.000” |
| source.project_id | 60399 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 60399” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | Various Locations Sewer Replacement No. 33 is an active sanitary sewer project managed by San Francisco Public... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=1da7acd271dea81b7e802f1557124a5f3f9f1c37fc99b54b58e476792f15e6f7” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 60399 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 18 geometries | reported | 2026-08-27 | live |
| summary | Various Locations Sewer Replacement No. 33 is an active sanitary sewer project managed by San Francisco Public Works' Hydraulic Engineering division, replacing sewer lines at roughly 18 sites across the Richmond, Inner Sunset, and Laurel Heights areas, including stretches of Golden Gate Avenue, Geary Boulevard, and Lake Street. The project is currently in the design phase, with construction scheduled to run from June 2028 to May 2029. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 18 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 02nd Ave from Hugo St to Irving St; 06th Ave from Hugo St to Irving St; 19th Ave from Cabrillo St to Fulton St; 24th Ave from Clement St to Geary Blvd; 26th Ave from El Camino Del Mar to Lake St; Anza St from 43rd Ave to 44th Ave; Cabrillo St from 21st Ave to 22nd Ave; Euclid Ave from Masonic Ave \ Walnut St to Laurel St; Geary Blvd from 39th Ave to 40th Ave; Golden Gate Ave from Annapolis Ter to Tamalpais Ter; Golden Gate Ave from Central Ave to Masonic Ave; Golden Gate Ave from Roselyn Ter to Kittredge Ter; Golden Gate Ave from Tamalpais Ter to Roselyn Ter; Lake St from 28th Ave to 29th Ave; Lyon St from Pine St to California St; Sutter St from Broderick St to Baker St; Turk Blvd from Central Ave to Nido Ave; Willard St from Mcallister St to Fulton St | derived | 2026-07-17 | live |
| schedule.end | 2029-05-31 | reported | 2026-07-17 | live |
| schedule.start | 2028-06-01 | reported | 2026-07-17 | live |
| source.project_id | 60399 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 2687i | reported | 2026-07-17 | live |
| name | Various Locations Sewer Replacement No 33 | reported | 2026-07-17 | live |