WD-2920: 8-inch Ductile Iron Water Main Replacement on Moraga, Noriega, and Ortega Streets from 11th to 7th Ave. and Various Side Streets

candidate project Planning Pre-Planning 286226ed-d9ac-4812-877b-ad8154f18492

The San Francisco Public Utilities Commission is planning to replace aging 8-inch ductile iron water mains along Moraga, Noriega, and Ortega Streets between roughly 7th and 11th Avenues, along with several side streets in the Sunset District. The project is in a pre-planning phase, with construction scheduled to run from June 2025 through December 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
description 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 11th Ave to 8th Ave reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 11th Ave to 8th Ave”
location.geometry 11 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“11 published segment geometries”
location.street_limits 10TH AVE from LAWTON ST to PACHECO ST; 11TH AVE from LAWTON ST to PACHECO ST; 8TH AVE; 9TH AVE from LAWTON ST to PACHECO ST; LAWTON ST; MORAGA ST; NORIEGA ST from 8TH AVE to 11TH AVE; ORTEGA ST from 8TH AVE to 11TH AVE; PACHECO ST from 11TH AVE to 10TH AVE derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name WD-2920: 8-inch Ductile Iron Water Main Replacement on Moraga, Noriega, and Ortega Streets from 11th to 7th Ave. and Various Side Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2920: 8-inch Ductile Iron Water Main Replacement on Moraga, Noriega, and Ortega Streets from 11th to 7th Ave. and Various Side Streets”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2026-12-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-12-30T00:00:00.000”
schedule.start 2025-06-20 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-06-20T00:00:00.000”
source.project_id 9116 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9116”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary The San Francisco Public Utilities Commission is planning to replace aging 8-inch ductile iron water mains along... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=c216e91033cedf76718d1059b5da92dc659d358cd71ae5b2cbebed3177b01167”

Source records

Public Works coordinated projects (DotMaps) key 9116 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary The San Francisco Public Utilities Commission is planning to replace aging 8-inch ductile iron water mains along Moraga, Noriega, and Ortega Streets between roughly 7th and 11th Avenues, along with several side streets in the Sunset District. The project is in a pre-planning phase, with construction scheduled to run from June 2025 through December 2026. No cost figures have been published. generated 2026-07-17 live
location.geometry 11 geometries reported 2026-07-17 live
location.street_limits 10TH AVE from LAWTON ST to PACHECO ST; 11TH AVE from LAWTON ST to PACHECO ST; 8TH AVE; 9TH AVE from LAWTON ST to PACHECO ST; LAWTON ST; MORAGA ST; NORIEGA ST from 8TH AVE to 11TH AVE; ORTEGA ST from 8TH AVE to 11TH AVE; PACHECO ST from 11TH AVE to 10TH AVE derived 2026-07-17 live
schedule.end 2026-12-30 reported 2026-07-17 live
schedule.start 2025-06-20 reported 2026-07-17 live
source.project_id 9116 reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 11th Ave to 8th Ave reported 2026-07-17 live
name WD-2920: 8-inch Ductile Iron Water Main Replacement on Moraga, Noriega, and Ortega Streets from 11th to 7th Ave. and Various Side Streets reported 2026-07-17 live