WD-2920: 8-inch Ductile Iron Water Main Replacement on Moraga, Noriega, and Ortega Streets from 11th to 7th Ave. and Various Side Streets
candidate project
Planning
Pre-Planning
286226ed-d9ac-4812-877b-ad8154f18492
The San Francisco Public Utilities Commission is planning to replace aging 8-inch ductile iron water mains along Moraga, Noriega, and Ortega Streets between roughly 7th and 11th Avenues, along with several side streets in the Sunset District. The project is in a pre-planning phase, with construction scheduled to run from June 2025 through December 2026. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water” |
| description | 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 11th Ave to 8th Ave |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 11th Ave to 8th Ave” |
| location.geometry | 11 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“11 published segment geometries” |
| location.street_limits | 10TH AVE from LAWTON ST to PACHECO ST; 11TH AVE from LAWTON ST to PACHECO ST; 8TH AVE; 9TH AVE from LAWTON ST to PACHECO ST; LAWTON ST; MORAGA ST; NORIEGA ST from 8TH AVE to 11TH AVE; ORTEGA ST from 8TH AVE to 11TH AVE; PACHECO ST from 11TH AVE to 10TH AVE |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | WD-2920: 8-inch Ductile Iron Water Main Replacement on Moraga, Noriega, and Ortega Streets from 11th to 7th Ave. and Various Side Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2920: 8-inch Ductile Iron Water Main Replacement on Moraga, Noriega, and Ortega Streets from 11th to 7th Ave. and Various Side Streets” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2026-12-30 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-12-30T00:00:00.000” |
| schedule.start | 2025-06-20 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-06-20T00:00:00.000” |
| source.project_id | 9116 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9116” |
| status | Pre-Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning” |
| summary | The San Francisco Public Utilities Commission is planning to replace aging 8-inch ductile iron water mains along... |
generated
llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=c216e91033cedf76718d1059b5da92dc659d358cd71ae5b2cbebed3177b01167” |
Source records
| Public Works coordinated projects (DotMaps) | key 9116 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| summary | The San Francisco Public Utilities Commission is planning to replace aging 8-inch ductile iron water mains along Moraga, Noriega, and Ortega Streets between roughly 7th and 11th Avenues, along with several side streets in the Sunset District. The project is in a pre-planning phase, with construction scheduled to run from June 2025 through December 2026. No cost figures have been published. | generated | 2026-07-17 | live |
| location.geometry | 11 geometries | reported | 2026-07-17 | live |
| location.street_limits | 10TH AVE from LAWTON ST to PACHECO ST; 11TH AVE from LAWTON ST to PACHECO ST; 8TH AVE; 9TH AVE from LAWTON ST to PACHECO ST; LAWTON ST; MORAGA ST; NORIEGA ST from 8TH AVE to 11TH AVE; ORTEGA ST from 8TH AVE to 11TH AVE; PACHECO ST from 11TH AVE to 10TH AVE | derived | 2026-07-17 | live |
| schedule.end | 2026-12-30 | reported | 2026-07-17 | live |
| schedule.start | 2025-06-20 | reported | 2026-07-17 | live |
| source.project_id | 9116 | reported | 2026-07-17 | live |
| agency.owner | SF PUC Water | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Pre-Planning | reported | 2026-07-17 | live |
| description | 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 11th Ave to 8th Ave | reported | 2026-07-17 | live |
| name | WD-2920: 8-inch Ductile Iron Water Main Replacement on Moraga, Noriega, and Ortega Streets from 11th to 7th Ave. and Various Side Streets | reported | 2026-07-17 | live |