Police Surge Facility Construction

candidate project Design 19539534-1aa1-49b2-97d9-10d1bbab5421

The Police Surge Facility Construction is a San Francisco Public Works project to build a temporary base for police operations while the Ingleside and Taraval stations are rebuilt. Located on Egbert Avenue between Newhall and Phelps streets, the facility will house those stations' current staff during construction. The project is currently in the design phase, with construction scheduled to run from December 2025 to February 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW BDC - Architecture reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW BDC - Architecture”
contact.email sherry.katz@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: sherry.katz@sfdpw.org”
contact.name Sherry Katz reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Sherry Katz”
description The Police department needs a Surge Facility as a temporary base for police operations while the Ingleside and Taraval stations are under construction.  The Surge Facility will accommodate those stations’ current staff for the duration of construction. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: The Police department needs a Surge Facility as a temporary base for police operations while the Ingleside and Taraval stations are under...”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits Egbert Ave from Newhall St to Phelps St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Police Surge Facility Construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Police Surge Facility Construction”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Land reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Land”
schedule.end 2027-02-08 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-02-08T00:00:00.000”
schedule.start 2025-12-09 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-12-09T00:00:00.000”
source.project_id 12748 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 12748”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Police Surge Facility Construction is a San Francisco Public Works project to build a temporary base for police... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=aa47c266929495f16e72fe01d4a678b38a72b8265f77e9590fa487ba3dd0e470”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.39926974126524, 37.72678018448691], [-122.400308857671, 37.72702094680696], [-122.4019551439937, 37.72795745652935]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.39926974, 37.72678018], [-122.40030886, 37.72702095], [-122.40195514, 37.72795746]]}]}

Source records

Public Works coordinated projects (DotMaps) key 12748 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The Police Surge Facility Construction is a San Francisco Public Works project to build a temporary base for police operations while the Ingleside and Taraval stations are rebuilt. Located on Egbert Avenue between Newhall and Phelps streets, the facility will house those stations' current staff during construction. The project is currently in the design phase, with construction scheduled to run from December 2025 to February 2027. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits Egbert Ave from Newhall St to Phelps St derived 2026-07-17 live
schedule.end 2027-02-08 reported 2026-07-17 live
schedule.start 2025-12-09 reported 2026-07-17 live
source.project_id 12748 reported 2026-07-17 live
contact.email sherry.katz@sfdpw.org reported 2026-07-17 live
contact.name Sherry Katz reported 2026-07-17 live
agency.owner SF DPW BDC - Architecture reported 2026-07-17 live
project_type Land reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description The Police department needs a Surge Facility as a temporary base for police operations while the Ingleside and Taraval stations are under construction.  The Surge Facility will accommodate those stations’ current staff for the duration of construction. reported 2026-07-17 live
name Police Surge Facility Construction reported 2026-07-17 live