Tenderloin Traffic Signal Upgrade
candidate project
Design
150f78a8-ab08-4994-9cd7-eede10e21acd
The Tenderloin Traffic Signal Upgrade is an active traffic signal project led by the SF MTA's Transportation Engineering division in San Francisco's Tenderloin neighborhood, covering multiple streets including Bush, Eddy, and Golden Gate Avenue. The project is currently in the design phase, with construction scheduled to run from April 2027 through the end of 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF MTA SS - Transportation Engineering (Capital) |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Transportation Engineering (Capital)” |
| contact.email | geraldine.deleon@sfmta.com |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: geraldine.deleon@sfmta.com” |
| contact.name | Geraldine de Leon |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Geraldine de Leon” |
| location.geometry | 17 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“17 published segment geometries” |
| location.street_limits | BUSH ST; EDDY ST; ELLIS ST; GOLDEN GATE AVE; HYDE ST; JONES ST; LARKIN ST; LEAVENWORTH ST; MCALLISTER ST; POLK ST; TURK ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Tenderloin Traffic Signal Upgrade |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Tenderloin Traffic Signal Upgrade” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Traffic Signal |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Traffic Signal” |
| schedule.end | 2028-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-12-31T00:00:00.000” |
| schedule.start | 2027-04-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-04-01T00:00:00.000” |
| source.project_id | 24827 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 24827” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Tenderloin Traffic Signal Upgrade is an active traffic signal project led by the SF MTA's Transportation... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 12 resolved fields; input sha256-v2=3a052cab2f78043c1105417333e93d5c7a01a1b782c60a8675eff70df0f1c778” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 24827 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 17 geometries | reported | 2026-08-27 | live |
| summary | The Tenderloin Traffic Signal Upgrade is an active traffic signal project led by the SF MTA's Transportation Engineering division in San Francisco's Tenderloin neighborhood, covering multiple streets including Bush, Eddy, and Golden Gate Avenue. The project is currently in the design phase, with construction scheduled to run from April 2027 through the end of 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 17 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | BUSH ST; EDDY ST; ELLIS ST; GOLDEN GATE AVE; HYDE ST; JONES ST; LARKIN ST; LEAVENWORTH ST; MCALLISTER ST; POLK ST; TURK ST | derived | 2026-07-17 | live |
| schedule.end | 2028-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2027-04-01 | reported | 2026-07-17 | live |
| source.project_id | 24827 | reported | 2026-07-17 | live |
| contact.email | geraldine.deleon@sfmta.com | reported | 2026-07-17 | live |
| contact.name | Geraldine de Leon | reported | 2026-07-17 | live |
| agency.owner | SF MTA SS - Transportation Engineering (Capital) | reported | 2026-07-17 | live |
| project_type | Traffic Signal | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| name | Tenderloin Traffic Signal Upgrade | reported | 2026-07-17 | live |