sfproj. every fact links to its evidence

← all projects

Westside Force Main Spot Repair

candidate project Design 1200a851-e579-4c0f-97ce-67e957899bde

The Westside Force Main Spot Repair is an active San Francisco Public Utilities Commission project to replace 50 feet of 48-inch diameter sewer force main along the Great Highway near the San Francisco Zoo, between Sloat and Skyline boulevards. Owned by the PUC's Engineering Management Bureau, the project is currently in the design phase, with work scheduled to run from December 2025 through the end of 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC - Engineering Management Bureau reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC - Engineering Management Bureau”
contact.email bcarlomagno@sfwater.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: bcarlomagno@sfwater.org”
contact.name Brian Carlomagno reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Brian Carlomagno”
description Replace 50 feet of 48-inch diameter sewer force main at Great Highway/Zoo reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Replace 50 feet of 48-inch diameter sewer force main at Great Highway/Zoo”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits GREAT HWY from SLOAT BLVD to SKYLINE BLVD derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Westside Force Main Spot Repair reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Westside Force Main Spot Repair”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sewer”
schedule.end 2026-12-31 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-12-31T00:00:00.000”
schedule.start 2025-12-17 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-12-17T00:00:00.000”
source.project_id 53071 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 53071”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Westside Force Main Spot Repair is an active San Francisco Public Utilities Commission project to replace 50... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=5ad8dae52b091662a1247d3ccd43ef67e8f7ee1541d8bd2332c85b4492b9c10f”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.50685072233466, 37.73423884453258], [-122.5069981086239, 37.733538207151476], [-122.50702903081076, 37.733243194034955]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.50685072, 37.73423884], [-122.50699811, 37.73353821], [-122.50702903, 37.73324319]]}]}

Source records

Public Works coordinated projects (DotMaps) key 53071 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The Westside Force Main Spot Repair is an active San Francisco Public Utilities Commission project to replace 50 feet of 48-inch diameter sewer force main along the Great Highway near the San Francisco Zoo, between Sloat and Skyline boulevards. Owned by the PUC's Engineering Management Bureau, the project is currently in the design phase, with work scheduled to run from December 2025 through the end of 2026. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits GREAT HWY from SLOAT BLVD to SKYLINE BLVD derived 2026-07-17 live
schedule.end 2026-12-31 reported 2026-07-17 live
schedule.start 2025-12-17 reported 2026-07-17 live
source.project_id 53071 reported 2026-07-17 live
contact.email bcarlomagno@sfwater.org reported 2026-07-17 live
contact.name Brian Carlomagno reported 2026-07-17 live
agency.owner SF PUC - Engineering Management Bureau reported 2026-07-17 live
project_type Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Replace 50 feet of 48-inch diameter sewer force main at Great Highway/Zoo reported 2026-07-17 live
name Westside Force Main Spot Repair reported 2026-07-17 live