Various Locations Sewer Replacement No 24
candidate project
Design
11fcf78a-ea7f-4c97-9f66-0600dca6d50d
Various Locations Sewer Replacement No. 24 is a sanitary sewer replacement project owned by San Francisco Public Works (Hydraulic Infrastructure Division). It involves rebuilding sewer lines across numerous scattered locations throughout the city, including segments of 15th Avenue, Bryant Street, and Jennings Street, among roughly 28 published street segments. The project is currently in the design phase, with construction scheduled to run from March 2027 to March 2028. No cost figures have been published.AI-generated
Updates (2)
What has happened on this project: the agency's own announcements, documents it published, changes we detected in its records, and independent coverage. Each entry says where it came from.
-
detected Aug 11, 2026Recorded changeExpected completion changedExpected completion: 2028-01-25 → 2028-03-26
-
detected Aug 11, 2026Recorded changeStart changedStart: 2027-01-23 → 2027-03-25
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| description | 2504i, WW-771 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2504i, WW-771” |
| location.geometry | 28 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“28 published segment geometries” |
| location.street_limits | 15th Ave from Vicente St to Wawona St; 18th Ave; 18th Ave from Taraval St to Ulloa St; 20th St; 21st St; 25th St; 25th St from Alabama St to Harrison St; 33rd Ave; 33rd Ave from Taraval St to Ulloa St; Bryant St from 10th St \ Hwy 101 S On Ramp to 11th St \ 13th St \ Division St; Capitol Ave; Diamond St from 20th St to 21st St; Diamond St from 21st St to 22nd St; El Verano Way; El Verano Way from Fernwood Dr to Maywood Dr; Galvez Ave; Jennings St; Jennings St from Palou Ave to Quesada Ave; Kirkwood Ave; Kirkwood Ave from Newhall St to Phelps St … |
derived
socrata:btxj-k9uh · retrieved 2026-08-11
“assembled from segment on/from/to street fields” |
| name | Various Locations Sewer Replacement No 24 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Sewer Replacement No 24” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Sanitary Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer” |
| schedule.end | 2028-03-26 |
reported
socrata:btxj-k9uh · retrieved 2026-08-11
“end_date: 2028-03-26T00:00:00.000” |
| schedule.start | 2027-03-25 |
reported
socrata:btxj-k9uh · retrieved 2026-08-11
“start_date: 2027-03-25T00:00:00.000” |
| source.project_id | 34292 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 34292” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | Various Locations Sewer Replacement No. 24 is a sanitary sewer replacement project owned by San Francisco Public... |
generated
llm:summarize · retrieved 2026-08-11
“generated from 13 resolved fields; input sha256-v2=7620ecbcd202b1d233c3410b12bd80c7b33708242c59dbcb37cf26cc96b2f87d” |
Changes
| 2026-08-27 | field changed immaterial | |
| 2026-08-11 | field changed immaterial | |
| 2026-08-11 | field changed immaterial | |
| 2026-08-11 | completion date changed | |
| 2026-08-11 | start date changed |
Source records
| Public Works coordinated projects (DotMaps) | key 34292 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 28 geometries | reported | 2026-08-27 | live |
| summary | Various Locations Sewer Replacement No. 24 is a sanitary sewer replacement project owned by San Francisco Public Works (Hydraulic Infrastructure Division). It involves rebuilding sewer lines across numerous scattered locations throughout the city, including segments of 15th Avenue, Bryant Street, and Jennings Street, among roughly 28 published street segments. The project is currently in the design phase, with construction scheduled to run from March 2027 to March 2028. No cost figures have been published. | generated | 2026-08-11 | live |
| location.geometry | 28 geometries | reported | 2026-08-11 | superseded |
| location.street_limits | 15th Ave from Vicente St to Wawona St; 18th Ave; 18th Ave from Taraval St to Ulloa St; 20th St; 21st St; 25th St; 25th St from Alabama St to Harrison St; 33rd Ave; 33rd Ave from Taraval St to Ulloa St; Bryant St from 10th St \ Hwy 101 S On Ramp to 11th St \ 13th St \ Division St; Capitol Ave; Diamond St from 20th St to 21st St; Diamond St from 21st St to 22nd St; El Verano Way; El Verano Way from Fernwood Dr to Maywood Dr; Galvez Ave; Jennings St; Jennings St from Palou Ave to Quesada Ave; Kirkwood Ave; Kirkwood Ave from Newhall St to Phelps St … | derived | 2026-08-11 | live |
| schedule.end | 2028-03-26 | reported | 2026-08-11 | live |
| schedule.start | 2027-03-25 | reported | 2026-08-11 | live |
| summary | This is a sanitary sewer replacement project managed by San Francisco Public Works (Hydraulic division), covering many street segments across the city, including stretches of 15th Avenue, 18th Avenue, and 25th Street, among roughly 40 locations. Known as Various Locations Sewer Replacement No. 24, the project is currently active and in the design phase, with construction scheduled to run from January 2027 to January 2028. No cost figures have been published. | generated | 2026-07-18 | superseded |
| location.geometry | 40 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 15th Ave from Vicente St to Wawona St; 18th Ave; 18th Ave from Taraval St to Ulloa St; 20th St; 21st St; 25th St; 25th St from Alabama St to Harrison St; 33rd Ave; 33rd Ave from Taraval St to Ulloa St; Andover St; Bryant St from 10th St \ Hwy 101 S On Ramp to 11th St \ 13th St \ Division St; Caine Ave from Lakeview Ave to Lobos St; Caine Ave from Ridge Ln to Lakeview Ave; Capitol Ave; Darien Way; Darien Way from Santa Ana Ave to San Benito Way; Diamond St from 20th St to 21st St; Diamond St from 21st St to 22nd St; El Verano Way; El Verano Way from Fernwood Dr to Maywood Dr … | derived | 2026-07-17 | superseded |
| schedule.end | 2028-01-25 | reported | 2026-07-17 | superseded |
| schedule.start | 2027-01-23 | reported | 2026-07-17 | superseded |
| source.project_id | 34292 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 2504i, WW-771 | reported | 2026-07-17 | live |
| name | Various Locations Sewer Replacement No 24 | reported | 2026-07-17 | live |