1415-011: 8-inch Ductile Iron Water Main Replacement on 22nd Street from Castro to Church Streets, on Noe Street from 20th to Alvarado Streets and Various Side Streets

candidate project Planning Pre-Planning 11d70505-ab1c-4852-a5fc-cc171777c19a

This is a San Francisco Public Utilities Commission water project to replace aging 8-inch ductile iron water mains in the Noe Valley area, primarily along 22nd Street from Castro to Church Streets, Noe Street from 20th to Alvarado Streets, and several adjacent side streets. The project is in pre-planning, with construction scheduled to run from February 2026 to March 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
description None8-inch Ductile Iron Water Main Replacement on 22nd Street from Castro to Church Streets, on Noe Street from 20th to Alvarado Streets and Various Side Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: None8-inch Ductile Iron Water Main Replacement on 22nd Street from Castro to Church Streets, on Noe Street from 20th to Alvarado Streets and...”
location.geometry 8 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“8 published segment geometries”
location.street_limits 20TH ST; 20TH ST from 20TH ST to NOE ST; 20TH ST from COLLINGWOOD ST to NOE ST; 22ND ST from CASTRO ST to CHURCH ST; ALVARADO ST from CASTRO ST to SANCHEZ ST; LIBERTY ST; NOE ST; SANCHEZ ST from 20TH ST to ALVARADO ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name 1415-011: 8-inch Ductile Iron Water Main Replacement on 22nd Street from Castro to Church Streets, on Noe Street from 20th to Alvarado Streets and Various Side Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: 1415-011: 8-inch Ductile Iron Water Main Replacement on 22nd Street from Castro to Church Streets, on Noe Street from 20th to Alvarado Streets and...”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2028-03-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-03-30T00:00:00.000”
schedule.start 2026-02-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-02-01T00:00:00.000”
source.project_id 8748 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8748”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary This is a San Francisco Public Utilities Commission water project to replace aging 8-inch ductile iron water mains... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=4fb0e4eeb8183e94a83b6be93978a9fd1fa74427f1ea90b5c77b394c97181c51”

Source records

Public Works coordinated projects (DotMaps) key 8748 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary This is a San Francisco Public Utilities Commission water project to replace aging 8-inch ductile iron water mains in the Noe Valley area, primarily along 22nd Street from Castro to Church Streets, Noe Street from 20th to Alvarado Streets, and several adjacent side streets. The project is in pre-planning, with construction scheduled to run from February 2026 to March 2028. No cost figures have been published. generated 2026-07-17 live
location.geometry 8 geometries reported 2026-07-17 live
location.street_limits 20TH ST; 20TH ST from 20TH ST to NOE ST; 20TH ST from COLLINGWOOD ST to NOE ST; 22ND ST from CASTRO ST to CHURCH ST; ALVARADO ST from CASTRO ST to SANCHEZ ST; LIBERTY ST; NOE ST; SANCHEZ ST from 20TH ST to ALVARADO ST derived 2026-07-17 live
schedule.end 2028-03-30 reported 2026-07-17 live
schedule.start 2026-02-01 reported 2026-07-17 live
source.project_id 8748 reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description None8-inch Ductile Iron Water Main Replacement on 22nd Street from Castro to Church Streets, on Noe Street from 20th to Alvarado Streets and Various Side Streets reported 2026-07-17 live
name 1415-011: 8-inch Ductile Iron Water Main Replacement on 22nd Street from Castro to Church Streets, on Noe Street from 20th to Alvarado Streets and Various Side Streets reported 2026-07-17 live