PW SEP Power Feed and Primary SWGR Upgrades

candidate project Construction 0e352858-4ba3-4a4b-a0ce-c28ee65e2701

The PW SEP Power Feed and Primary SWGR Upgrades is an active construction project by San Francisco Public Works (Bureau of Architecture) along Evans Avenue, building an enclosure to house electrical equipment for the Southeast Pollution Control Plant. Work began in October 2020 and is scheduled to be completed by the end of September 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW BDC - Architecture reported socrata:btxj-k9uh · retrieved 2026-07-29
“agency_name: SF DPW BDC - Architecture”
contact.email Reggie.Stump@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-29
“project_manager_email: Reggie.Stump@sfdpw.org”
contact.name Reggie Stump reported socrata:btxj-k9uh · retrieved 2026-07-29
“project_manager_name: Reggie Stump”
description Building enclosure for Southeast Pollution Control Plant electrical equipment. reported socrata:btxj-k9uh · retrieved 2026-07-29
“description: Building enclosure for Southeast Pollution Control Plant electrical equipment.”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits Evans Ave derived socrata:btxj-k9uh · retrieved 2026-07-29
“assembled from segment on/from/to street fields”
name PW SEP Power Feed and Primary SWGR Upgrades reported socrata:btxj-k9uh · retrieved 2026-07-29
“name: PW SEP Power Feed and Primary SWGR Upgrades”
phase Construction reported socrata:btxj-k9uh · retrieved 2026-07-29
“project_phase: Construction”
project_type Land reported socrata:btxj-k9uh · retrieved 2026-07-29
“facility_type: Land”
schedule.end 2026-09-30 reported socrata:btxj-k9uh · retrieved 2026-07-29
“end_date: 2026-09-30T00:00:00.000”
schedule.start 2020-10-05 reported socrata:btxj-k9uh · retrieved 2026-07-29
“start_date: 2020-10-05T00:00:00.000”
source.project_id 12747 reported socrata:btxj-k9uh · retrieved 2026-07-29
“dotmapsid: 12747”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-29
“project_status: Active”
summary The PW SEP Power Feed and Primary SWGR Upgrades is an active construction project by San Francisco Public Works... generated llm:summarize · retrieved 2026-07-29
“generated from 13 resolved fields; input sha256-v2=bbdd7fc77d0a309f64abfdaaf239c0314c221ee7c96f6d9a7f86a5da7a95aa2b”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.38845502942004, 37.742980617512956]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.38845503, 37.74298062]}]}

Source records

Public Works coordinated projects (DotMaps) key 12747 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The PW SEP Power Feed and Primary SWGR Upgrades is an active construction project by San Francisco Public Works (Bureau of Architecture) along Evans Avenue, building an enclosure to house electrical equipment for the Southeast Pollution Control Plant. Work began in October 2020 and is scheduled to be completed by the end of September 2026. No cost figures have been published. generated 2026-07-29 live
location.geometry 1 geometries reported 2026-07-29 superseded
location.street_limits Evans Ave derived 2026-07-29 live
schedule.end 2026-09-30 reported 2026-07-29 live
schedule.start 2020-10-05 reported 2026-07-29 live
source.project_id 12747 reported 2026-07-29 live
contact.email Reggie.Stump@sfdpw.org reported 2026-07-29 live
contact.name Reggie Stump reported 2026-07-29 live
agency.owner SF DPW BDC - Architecture reported 2026-07-29 live
project_type Land reported 2026-07-29 live
phase Construction reported 2026-07-29 live
status Active reported 2026-07-29 live
description Building enclosure for Southeast Pollution Control Plant electrical equipment. reported 2026-07-29 live
name PW SEP Power Feed and Primary SWGR Upgrades reported 2026-07-29 live