sfproj. every fact links to its evidence

← all projects

29 Sunset Phase 2 AHSC Bulbs

candidate project Design 0dafd68d-0298-44cb-b041-de11e9edfac5

The 29 Sunset Phase 2 AHSC Bulbs is an active roadway project owned by San Francisco Public Works (Streets & Highways division), currently in the design phase. Located near the Plymouth Avenue intersections at Ocean and Grafton avenues, the work would build four curb bulb-outs, one transit bulb, and ten curb ramps across two intersections. Construction is scheduled to run from June 2027 to June 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Ellen.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Ellen.Wong@sfdpw.org”
contact.name Ellen Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Ellen Wong”
description Plymouth/Ocean and Plymouth/Grafton - 2 Intersections, 4 bulbs, 1 transit bulb, 10 curb ramps reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Plymouth/Ocean and Plymouth/Grafton - 2 Intersections, 4 bulbs, 1 transit bulb, 10 curb ramps”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits Grafton Ave derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name 29 Sunset Phase 2 AHSC Bulbs reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: 29 Sunset Phase 2 AHSC Bulbs”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2028-06-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-06-30T00:00:00.000”
schedule.start 2027-06-21 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-06-21T00:00:00.000”
source.project_id 57722 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 57722”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The 29 Sunset Phase 2 AHSC Bulbs is an active roadway project owned by San Francisco Public Works (Streets &... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=1a0b17c7e4fa54db919e4000e606810ca3b8f5292b6c7e12ff0fb31940d115ab”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4561334978987, 37.72003330130314]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4561335, 37.7200333]}]}

Source records

Public Works coordinated projects (DotMaps) key 57722 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The 29 Sunset Phase 2 AHSC Bulbs is an active roadway project owned by San Francisco Public Works (Streets & Highways division), currently in the design phase. Located near the Plymouth Avenue intersections at Ocean and Grafton avenues, the work would build four curb bulb-outs, one transit bulb, and ten curb ramps across two intersections. Construction is scheduled to run from June 2027 to June 2028. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits Grafton Ave derived 2026-07-17 live
schedule.end 2028-06-30 reported 2026-07-17 live
schedule.start 2027-06-21 reported 2026-07-17 live
source.project_id 57722 reported 2026-07-17 live
contact.email Ellen.Wong@sfdpw.org reported 2026-07-17 live
contact.name Ellen Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Plymouth/Ocean and Plymouth/Grafton - 2 Intersections, 4 bulbs, 1 transit bulb, 10 curb ramps reported 2026-07-17 live
name 29 Sunset Phase 2 AHSC Bulbs reported 2026-07-17 live