Downtown Ferry and South Beach Electrification
candidate project
Planning
07bed08b-029f-4b12-af25-e1cf3b48d56b
The Downtown Ferry and South Beach Electrification is a planned electrical project by the San Francisco Public Utilities Commission's Engineering Management Bureau. The project involves building an electrical distribution duct bank and is currently in the planning phase, with construction scheduled to run from 2026 through the end of 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC - Engineering Management Bureau |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC - Engineering Management Bureau” |
| contact.email | jandresen@sfwater.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: jandresen@sfwater.org” |
| contact.name | Josh Andresen |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Josh Andresen” |
| description | Electrical distribution duct bank. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Electrical distribution duct bank.” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| name | Downtown Ferry and South Beach Electrification |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Downtown Ferry and South Beach Electrification” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Electrical |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Electrical” |
| schedule.end | 2028-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-12-31T00:00:00.000” |
| schedule.start | 2026-01-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-01-01T00:00:00.000” |
| source.project_id | 26554 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 26554” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Downtown Ferry and South Beach Electrification is a planned electrical project by the San Francisco Public... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 12 resolved fields; input sha256-v2=5097696100b4f1eea592e3220a5eab55a68fd2dff92f2812b994188cf6f7d72b” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 26554 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | The Downtown Ferry and South Beach Electrification is a planned electrical project by the San Francisco Public Utilities Commission's Engineering Management Bureau. The project involves building an electrical distribution duct bank and is currently in the planning phase, with construction scheduled to run from 2026 through the end of 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| schedule.end | 2028-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2026-01-01 | reported | 2026-07-17 | live |
| source.project_id | 26554 | reported | 2026-07-17 | live |
| contact.email | jandresen@sfwater.org | reported | 2026-07-17 | live |
| contact.name | Josh Andresen | reported | 2026-07-17 | live |
| agency.owner | SF PUC - Engineering Management Bureau | reported | 2026-07-17 | live |
| project_type | Electrical | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Electrical distribution duct bank. | reported | 2026-07-17 | live |
| name | Downtown Ferry and South Beach Electrification | reported | 2026-07-17 | live |