This is a planned roadway paving project along Mission Street and adjoining streets in San Francisco, led jointly with the SFMTA and coordinated by SF Public Works' Streets & Highways division. Covering roughly 56 street segments — largely stretches of Mission Street along with cross streets such as Allison, Bosworth and Concord — it is still in pre-planning, with construction currently scheduled to run from late 2031 into early 2033. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Paul.Barradas@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Paul.Barradas@sfdpw.org”
contact.name Paul Barradas reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Paul Barradas”
location.geometry 56 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“56 published segment geometries”
location.street_limits Allison St; Bosworth St; College Ter; Concord St; Farragut Ave; Florentine Ave; Foote Ave; Guttenberg St; Huron Ave; Laura St; Lawrence Ave; Lowell St; Mission St; Mission St from Acton St \ Sickles Ave to Huron Ave; Mission St from Allison St to Mount Vernon Ave; Mission St from Bosworth St \ Murray St to Trumbull St; Mission St from Brook St \ Santa Marina St to Randall St; Mission St from College Ave \ Crescent Ave to College Ter; Mission St from College Ter to Saint Marys Ave; Mission St from Concord St to Ottawa Ave … derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Joint - SFMTA Lead - Mission St Pavement Renovation 2 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Joint - SFMTA Lead - Mission St Pavement Renovation 2”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2033-01-09 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2033-01-09T00:00:00.000”
schedule.start 2031-10-28 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2031-10-28T00:00:00.000”
source.project_id 8195 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8195”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary This is a planned roadway paving project along Mission Street and adjoining streets in San Francisco, led jointly... generated llm:summarize · retrieved 2026-07-17
“generated from 12 resolved fields; input sha256-v2=3aa1c2c107d9f02ae2d76cc8e7fed7ab92331a958c90a31c1776dc86ecfd6f98”

Source records

Public Works coordinated projects (DotMaps) key 8195 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary This is a planned roadway paving project along Mission Street and adjoining streets in San Francisco, led jointly with the SFMTA and coordinated by SF Public Works' Streets & Highways division. Covering roughly 56 street segments — largely stretches of Mission Street along with cross streets such as Allison, Bosworth and Concord — it is still in pre-planning, with construction currently scheduled to run from late 2031 into early 2033. No cost figures have been published. generated 2026-07-17 live
location.geometry 56 geometries reported 2026-07-17 live
location.street_limits Allison St; Bosworth St; College Ter; Concord St; Farragut Ave; Florentine Ave; Foote Ave; Guttenberg St; Huron Ave; Laura St; Lawrence Ave; Lowell St; Mission St; Mission St from Acton St \ Sickles Ave to Huron Ave; Mission St from Allison St to Mount Vernon Ave; Mission St from Bosworth St \ Murray St to Trumbull St; Mission St from Brook St \ Santa Marina St to Randall St; Mission St from College Ave \ Crescent Ave to College Ter; Mission St from College Ter to Saint Marys Ave; Mission St from Concord St to Ottawa Ave … derived 2026-07-17 live
schedule.end 2033-01-09 reported 2026-07-17 live
schedule.start 2031-10-28 reported 2026-07-17 live
source.project_id 8195 reported 2026-07-17 live
contact.email Paul.Barradas@sfdpw.org reported 2026-07-17 live
contact.name Paul Barradas reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
name Joint - SFMTA Lead - Mission St Pavement Renovation 2 reported 2026-07-17 live