Pier 80 Electrification

candidate project Planning 079d9a06-c965-42cb-afdf-175d59d6b800

The Pier 80 Electrification project is a planning-phase effort led by the SF Port to install a 12kV electrical line underground running from the PG&E substation at 496 23rd Street to Pier 80, along parts of Cesar Chavez Street, Illinois Street, and 23rd Street. The work is currently active and scheduled to run from January 2025 through January 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF Port reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF Port”
contact.email noel.aquino@sfport.com reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: noel.aquino@sfport.com”
contact.name Noel Aquino reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Noel Aquino”
description 12KV Electrical Line Underground Installation from PG&E substation at 496 23rd Street to CESAR CHAVEZ ST & ILLINOIS ST, CESAR CHAVEZ ST & ILLINOIS ST to 23RD ST & ILLINOIS ST, and ILLINOIS ST & CESAR CHAVEZ ST to MARYLAND ST & CESAR CHAVEZ ST reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 12KV Electrical Line Underground Installation from PG&E substation at 496 23rd Street to CESAR CHAVEZ ST & ILLINOIS ST, CESAR CHAVEZ ST &...”
location.geometry 3 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“3 published segment geometries”
location.street_limits 23RD ST; CESAR CHAVEZ ST from MARYLAND ST to ILLINOIS ST; ILLINOIS ST from CESAR CHAVEZ ST to 23RD ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Pier 80 Electrification reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Pier 80 Electrification”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2028-01-28 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-01-28T00:00:00.000”
schedule.start 2025-01-16 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-01-16T00:00:00.000”
source.project_id 35655 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 35655”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Pier 80 Electrification project is a planning-phase effort led by the SF Port to install a 12kV electrical line... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=44d8d71aac274bb7f2f3e7e111d358f7a5d00646df5015fec7723d60ce30de89”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.38270715365891, 37.750564826526144], [-122.38562921411206, 37.75038772031247], [-122.38658150581243, 37.75032998691339]]}, {'type': 'LineString', 'coordinates': [[-122.38567745111114, 37.755538414535984], [-122.3870790603031, 37.75545116586548]]}, {'type': 'LineString', 'coordinates': [[-122.38658150581243, 37.75032998691339], [-122.38669714220526, 37.75161120408695], [-122.38682485483697, 37.752895322358974], [-122.38695190458493, 37.75417274135499], [-122.38707906030308, 37.75545116586548]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.38270715, 37.75056483], [-122.38562921, 37.75038772], [-122.38658151, 37.75032999]]}, {'type': 'LineString', 'coordinates': [[-122.38567745, 37.75553841], [-122.38707906, 37.75545117]]}, {'type': 'LineString', 'coordinates': [[-122.38658151, 37.75032999], [-122.38669714, 37.7516112], [-122.38682485, 37.75289532], [-122.3869519, 37.75417274], [-122.38707906, 37.75545117]]}]}

Source records

Public Works coordinated projects (DotMaps) key 35655 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 3 geometries reported 2026-08-27 live
summary The Pier 80 Electrification project is a planning-phase effort led by the SF Port to install a 12kV electrical line underground running from the PG&E substation at 496 23rd Street to Pier 80, along parts of Cesar Chavez Street, Illinois Street, and 23rd Street. The work is currently active and scheduled to run from January 2025 through January 2028. No cost figures have been published. generated 2026-07-18 live
location.geometry 3 geometries reported 2026-07-17 superseded
location.street_limits 23RD ST; CESAR CHAVEZ ST from MARYLAND ST to ILLINOIS ST; ILLINOIS ST from CESAR CHAVEZ ST to 23RD ST derived 2026-07-17 live
schedule.end 2028-01-28 reported 2026-07-17 live
schedule.start 2025-01-16 reported 2026-07-17 live
source.project_id 35655 reported 2026-07-17 live
contact.email noel.aquino@sfport.com reported 2026-07-17 live
contact.name Noel Aquino reported 2026-07-17 live
agency.owner SF Port reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Active reported 2026-07-17 live
description 12KV Electrical Line Underground Installation from PG&E substation at 496 23rd Street to CESAR CHAVEZ ST & ILLINOIS ST, CESAR CHAVEZ ST & ILLINOIS ST to 23RD ST & ILLINOIS ST, and ILLINOIS ST & CESAR CHAVEZ ST to MARYLAND ST & CESAR CHAVEZ ST reported 2026-07-17 live
name Pier 80 Electrification reported 2026-07-17 live