Islais Creek Facility BEB Charging Infrastructure-Phase 1
candidate project
Design
0708ef00-a008-46ca-bf2c-2a080e5314ca
The Islais Creek Facility Battery-Electric Bus (BEB) Charging Infrastructure Phase 1 is a transportation facility project led by the San Francisco Municipal Transportation Agency (SFMTA). The project involves installing an inverted pantograph charging system for six 60-foot battery-electric buses, including power blocks, overhead pantographs, and supporting infrastructure, along with upgrading the existing PG&E electrical service to handle the increased power load, including new conduits and an underground pull box on Indiana Street. The project is active and currently in its preliminary design phase. No cost figures or schedule dates have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF MTA SS - Transportation Engineering (Capital) |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Transportation Engineering (Capital)” |
| contact.email | christian.kalinowski@sfmta.com |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: christian.kalinowski@sfmta.com” |
| contact.name | Kalinowski, Christian |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Kalinowski, Christian” |
| description | The San Francisco Municipal Transportation Agency (SFMTA) is currently in the Preliminary Design Phase of the subject project. This project will be installing BEB charging system equipment and needs to upgrade the existing PG&E service to accommodate the electrical power load increase. The project scope includes, but not limited to the followings: 1) Furnish, install, and commission an inverted pantograph charging system for six (6) 60'-BEB charging stations, including three (3) power blocks, three (3) power links, six (6) inverted overhead pantographs, six (6) pantograph controllers, and supporting infrastructure. 2) Furnish and install conduits and PG&E #7 underground pull box on Indiana Street per PG&E construction drawing to accommodate PG&E service contract demand increase. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: The San Francisco Municipal Transportation Agency (SFMTA) is currently in the Preliminary Design Phase of the subject project. This project...” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| name | Islais Creek Facility BEB Charging Infrastructure-Phase 1 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Islais Creek Facility BEB Charging Infrastructure-Phase 1” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Transportation Facility |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Transportation Facility” |
| source.project_id | 33698 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 33698” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Islais Creek Facility Battery-Electric Bus (BEB) Charging Infrastructure Phase 1 is a transportation facility... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 10 resolved fields; input sha256-v2=8f272263815075f5c22642e877afbf782eb7b6fb6f40c7bfb07a5d5b7cab626b” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 33698 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | The Islais Creek Facility Battery-Electric Bus (BEB) Charging Infrastructure Phase 1 is a transportation facility project led by the San Francisco Municipal Transportation Agency (SFMTA). The project involves installing an inverted pantograph charging system for six 60-foot battery-electric buses, including power blocks, overhead pantographs, and supporting infrastructure, along with upgrading the existing PG&E electrical service to handle the increased power load, including new conduits and an underground pull box on Indiana Street. The project is active and currently in its preliminary design phase. No cost figures or schedule dates have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| source.project_id | 33698 | reported | 2026-07-17 | live |
| contact.email | christian.kalinowski@sfmta.com | reported | 2026-07-17 | live |
| contact.name | Kalinowski, Christian | reported | 2026-07-17 | live |
| agency.owner | SF MTA SS - Transportation Engineering (Capital) | reported | 2026-07-17 | live |
| project_type | Transportation Facility | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | The San Francisco Municipal Transportation Agency (SFMTA) is currently in the Preliminary Design Phase of the subject project. This project will be installing BEB charging system equipment and needs to upgrade the existing PG&E service to accommodate the electrical power load increase. The project scope includes, but not limited to the followings: 1) Furnish, install, and commission an inverted pantograph charging system for six (6) 60'-BEB charging stations, including three (3) power blocks, three (3) power links, six (6) inverted overhead pantographs, six (6) pantograph controllers, and supporting infrastructure. 2) Furnish and install conduits and PG&E #7 underground pull box on Indiana Street per PG&E construction drawing to accommodate PG&E service contract demand increase. | reported | 2026-07-17 | live |
| name | Islais Creek Facility BEB Charging Infrastructure-Phase 1 | reported | 2026-07-17 | live |