sfproj. every fact links to its evidence

← all projects

Islais Creek Facility BEB Charging Infrastructure-Phase 1

candidate project Design 0708ef00-a008-46ca-bf2c-2a080e5314ca

Current record

FieldValueProvenance
agency.owner SF MTA SS - Transportation Engineering (Capital) reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Transportation Engineering (Capital)”
contact.email christian.kalinowski@sfmta.com reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: christian.kalinowski@sfmta.com”
contact.name Kalinowski, Christian reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Kalinowski, Christian”
description The San Francisco Municipal Transportation Agency (SFMTA) is currently in the Preliminary Design Phase of the subject project. This project will be installing BEB charging system equipment and needs to upgrade the existing PG&E service to accommodate the electrical power load increase. The project scope includes, but not limited to the followings: 1) Furnish, install, and commission an inverted pantograph charging system for six (6) 60'-BEB charging stations, including three (3) power blocks, three (3) power links, six (6) inverted overhead pantographs, six (6) pantograph controllers, and supporting infrastructure. 2) Furnish and install conduits and PG&E #7 underground pull box on Indiana Street per PG&E construction drawing to accommodate PG&E service contract demand increase. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: The San Francisco Municipal Transportation Agency (SFMTA) is currently in the Preliminary Design Phase of the subject project. This project...”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“1 published segment geometries”
name Islais Creek Facility BEB Charging Infrastructure-Phase 1 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Islais Creek Facility BEB Charging Infrastructure-Phase 1”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Transportation Facility reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Transportation Facility”
source.project_id 33698 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 33698”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”

Source records

Public Works coordinated projects (DotMaps) key 33698 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-07-17 live
source.project_id 33698 reported 2026-07-17 live
contact.email christian.kalinowski@sfmta.com reported 2026-07-17 live
contact.name Kalinowski, Christian reported 2026-07-17 live
agency.owner SF MTA SS - Transportation Engineering (Capital) reported 2026-07-17 live
project_type Transportation Facility reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description The San Francisco Municipal Transportation Agency (SFMTA) is currently in the Preliminary Design Phase of the subject project. This project will be installing BEB charging system equipment and needs to upgrade the existing PG&E service to accommodate the electrical power load increase. The project scope includes, but not limited to the followings: 1) Furnish, install, and commission an inverted pantograph charging system for six (6) 60'-BEB charging stations, including three (3) power blocks, three (3) power links, six (6) inverted overhead pantographs, six (6) pantograph controllers, and supporting infrastructure. 2) Furnish and install conduits and PG&E #7 underground pull box on Indiana Street per PG&E construction drawing to accommodate PG&E service contract demand increase. reported 2026-07-17 live
name Islais Creek Facility BEB Charging Infrastructure-Phase 1 reported 2026-07-17 live