sfproj. every fact links to its evidence

← all projects

PW Various Locations Sewer Replacement (JV VL PR No 79)

candidate project Design 026919ac-eb67-48e9-81a8-963708502ec5

The PW Various Locations Sewer Replacement project (JV VL PR No 79) is a sanitary sewer replacement led by San Francisco Public Works' Hydraulic division. The work covers three locations: De Haro Street between Alameda and 15th streets, Rhode Island Street between 18th and 19th streets, and Townsend Street between 7th and 8th streets. The project is currently active and in the design phase, scheduled to run from September 2025 through November 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description 2371i reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2371i”
location.geometry 3 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“3 published segment geometries”
location.street_limits De Haro St from Alameda St to 15th St; Rhode Island St from 18th St to 19th St; Townsend St from 07th St to 08th St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name PW Various Locations Sewer Replacement (JV VL PR No 79) reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW Various Locations Sewer Replacement (JV VL PR No 79)”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2026-11-17 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-11-17T00:00:00.000”
schedule.start 2025-09-04 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-09-04T00:00:00.000”
source.project_id 11686 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 11686”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The PW Various Locations Sewer Replacement project (JV VL PR No 79) is a sanitary sewer replacement led by San... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=129c62bcbd588220b6a11cbb344baad191b30647ff663f4d7f4130adf7371fa4”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.40232695388055, 37.762229393761615], [-122.40220317469485, 37.76095059633889]]}, {'type': 'LineString', 'coordinates': [[-122.4016566806702, 37.77181712572346], [-122.40387770017867, 37.77006286630835]]}, {'type': 'LineString', 'coordinates': [[-122.40196235063758, 37.76870620906318], [-122.40184250337795, 37.76743077697943]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.40232695, 37.76222939], [-122.40220317, 37.7609506]]}, {'type': 'LineString', 'coordinates': [[-122.40165668, 37.77181713], [-122.4038777, 37.77006287]]}, {'type': 'LineString', 'coordinates': [[-122.40196235, 37.76870621], [-122.4018425, 37.76743078]]}]}

Source records

Public Works coordinated projects (DotMaps) key 11686 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 3 geometries reported 2026-08-27 live
summary The PW Various Locations Sewer Replacement project (JV VL PR No 79) is a sanitary sewer replacement led by San Francisco Public Works' Hydraulic division. The work covers three locations: De Haro Street between Alameda and 15th streets, Rhode Island Street between 18th and 19th streets, and Townsend Street between 7th and 8th streets. The project is currently active and in the design phase, scheduled to run from September 2025 through November 2026. No cost figures have been published. generated 2026-07-18 live
location.geometry 3 geometries reported 2026-07-17 superseded
location.street_limits De Haro St from Alameda St to 15th St; Rhode Island St from 18th St to 19th St; Townsend St from 07th St to 08th St derived 2026-07-17 live
schedule.end 2026-11-17 reported 2026-07-17 live
schedule.start 2025-09-04 reported 2026-07-17 live
source.project_id 11686 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2371i reported 2026-07-17 live
name PW Various Locations Sewer Replacement (JV VL PR No 79) reported 2026-07-17 live